1 / 28

" Society, my dear, is like salt water, good to swim in but hard to swallow." Arthur Stringer, The Silver Pop

" Society, my dear, is like salt water, good to swim in but hard to swallow." Arthur Stringer, The Silver Poppy. Desalination Plants & the Environment Ranger Uranium Mine Experience. Alan Nisbet OSMOFLO Pty Ltd. Contents. Who is OSMO FLO? Desalination - overview

creda
Télécharger la présentation

" Society, my dear, is like salt water, good to swim in but hard to swallow." Arthur Stringer, The Silver Pop

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. "Society, my dear, is like salt water, good to swim in but hard to swallow." Arthur Stringer, The Silver Poppy

  2. Desalination Plants & the Environment Ranger Uranium Mine Experience Alan Nisbet OSMOFLO Pty Ltd

  3. Contents • Who is OSMOFLO? • Desalination - overview • Environmental Challenges at ERA –Ranger Mine site • OSMOFLO solution • Current Desalination Projects Australia Wide 

  4. Australia’s Desalination Company

  5. All Australian Company • Australia’s largest manufacturer of desalination systems • 17 years experience • 200 strong workforce dedicated to desalination technology

  6. More than 250 Plants Worldwide Providing: • Drinking water from seawater or brackish groundwater • Process water for industrial applications – Mining, Energy, Community Water, Medical, Food & Beverage & General Industry • Custom Engineering • Technical Support 24/7

  7. World Class Manufacturing Facility • RO manufacturing capability in Australia raised to a new level • World class facility (4 times larger than current size) • Provides a ready-made fabrication line to support Prime Contractors building Australia’s large scale desalination plants

  8. Introduction • Large scale desalination in 1950s - distillation • RO developed 1960s (cellulose acetate) • TFC 1980s • Continuous improvement • Becoming competitive with “harder to obtain” surface or ground water sources

  9. Unit Costs for Alternative Water Sources

  10. Desalination in SA • First desalination plant at Penneshaw (1999) – 300 kL/d and 30 ML storage • Marion Bay SWRO plant (30 kL/d) for DC Yorke Peninsula • Potential projects • BHP Billiton Whyalla – 150 ML/d • Adelaide – 270 ML/d feasibility study

  11. Reverse Osmosis Seawater reverse osmosis recovery is 45% Permeate 0.45 Feed 1.00 Concentrate 0.55

  12. Desalinisation Environmental Challenges at Ranger Uranium

  13. Ranger Mine – Kakadu National Park • Uranium Mine on Traditional Aboriginal Land., surrounded by World Heritage and Wetlands of International Standing. • Most regulated Mine site in Australia • 30-40 Govt Agencies have assets within Kakadu to protect • 70- 80 Acts of Parliament directly related to Ranger Operations at Kakadu • Water discharge only allowed after extensive contingencies and multiple back-up plans implemented

  14. Pond Water (RP2) Background/ Problems • RP2collects rain that falls on stockpiles ore body #1 and other areas around processing plant • Potential problems arise when ponds are at or near capacity • Excess pond water due to steady accumulation of water during above average wet season years between 1996 and present • All year mining planned from late 2006 -2008 • Feb2007 800mm of rain in 3 days (1 in 2,000 year event) Cyclone George. • Pond water contains following Cations, Anions and other parameters ; Calcium, Manganese, magnesium, sulfate and Uranium • Disposal to Magella Creek requires treatment to reduce parameters to acceptable disposal levels determined by Commonwealth Environmental Requirements

  15. RP 2 Solution • Pilot plant study to explore method of reducing U &226 Ra in Pond Water for discharge to Magellan creek during wet season – Limits 40ug/L Uranium and 100 mbq/L Ra. • Magella Creek Water Quality Objectives • Action Levels Limit • pH 5.6,6.7 5.2,6.9 • Turbidity 10 26 • U 0.9 6.0 • Mn 11 26 • Radium 226 26 • Mg Use EC triggers • Sulfate Use EC triggers Key Variables: pH,EC,Sulfate,Manganese, Uranium and Radium

  16. Pilot Plant Results • Overall, the trial objectives were met and the water treatment process for RP2 water at Ranger had been developed and proven. • RO Antiscalant Critical • Parameter Units Maximum value for discharge Value achieved in trial Maximum value for discharge • U μg/L 40* Average 5.3 Maximum measured 8.6 • Ra mBq/L 100* Average 15.3 Maximum measured 22.8 • Conductivity μS/cm 400* < 30 for entire trial

  17. Location map RP1 Pit 3 RP2 Tailings dam Pit 1

  18. Composition of RP2 water over time

  19. New Osmoflo plant

  20. Current Desalination Projects Australia Wide

  21. Questions? "

More Related