Introduction • Design project 2: Xerox igen4 • Paper Velocity measurement device • Why is it Important? • Utilization of our design solution.
Our Idea • Brainstorming • Many possible solutions • 5 different ideas • Concept generation • Scanning laser solution. • Ultrasound or supersonic solution • Induction Coils.
Selection Matrices Cont… • We decided to develop concept “B”
How it works • 6 different laser detectors read the precise time when the paper passes underneath. • Advantages of using 6 lasers. • Using the simple formula: • Velocity = Distance/Time • This design calculates the speed up to 15 times! • This makes our design extremely accurate and reliable.
Advantages of Our Design • Simple • Generic formula • Reliable • Can still compute velocity even if one laser fails • Very Accurate • Computes the average speed at different locations • Easy instillation • Reasonably compact • Few Components.
Design Features • Design features • 1- Simple to install • 2- Easy to replace parts. • 3- Low power usage • 4- Safe to operate • 5- Very high accuracy • 6- Measures velocity up to 15 times! • 7- Can order packages with 2, 4, or 6 lasers.
Conclusion • Thank you for kindly not falling asleep during the duration of our presentation • Good Luck on your Finals and have a great winter break!