Winona State University (WSU) has pledged to achieve climate neutrality by 2050 as an early signatory of the American College and University Presidents' Climate Commitment (ACUPCC). The recently published Climate Action Plan outlines strategies such as LEED silver standards for new construction and a robust emphasis on transportation alternatives, including the Purple Bike and Zipcar programs. Additionally, the university is engaged in various energy conservation measures, including upgrading building systems and installing energy-efficient fixtures, to achieve sustainable and effective energy management.
E N D
WSU GOES GREEN • Early signatory to American College and University Presidents Climate Commitment (ACUPCC) • Goal to reach climate neutrality by 2050 • Recently published Climate Action Plan • All new construction to meet Green Building Council’s LEED silver standard or Equivalent • Strong focus on transportation alternatives • Purple Bike Program (bike sharing) • Zipcar Program (car sharing) • Sustain Winona Partnership • Provides regional focus on sustainability • Curriculum redesign initiatives www.winona.edu/green
WSU Energy Conservation – Current State • Retrofit Utility Plant Boilers • Centrally Control Bldg HVAC Systems • Install Heat Recovery Coils • Convert to Digital Thermostats • Upgrade to LED Lighting • Install Energy Efficient Windows • Utilize Timer Switches for Lighting • Install Energy Star Appliances • Use Electronic and Low Consumption Faucets Low Hanging Fruit All Picked
The Way Ahead:Guaranteed Energy Savings Program Minnesota Statute 16C.144 • State empowered to enter into guaranteed energy savings agreements and lease purchase agreements intended to achieve utility, operation and maintenance cost savings • Qualified provider selected through competitive process • Implementation of utility cost savings measures can’t exceed savings • Payback not to exceed 15 yrs
Guaranteed Energy Savings Program Milestones • Consultation with AG/OOC • Obtain Consultant to Develop RFP • Select Energy Savings Company (ESCO) • Contract ESCO to Identify Facility Improvement Measures (FIMs) • Evaluate/Agree to FIMs • Independent Third Party Audit of Savings Potential • BOT Approval • Lease Purchase Agreement • Construction Contract • Implementation, Training, On-Going Assessment