This report details recent decommissioning activities for the DØ detector, including the nitrogen purge of VLPC cryostats, updates on radiation area classifications, and modifications to various chiller systems. Key actions include the powering down of the calorimeter test stand, the movement of 120 farm nodes, and continued purging of VLPC cryostats. The report emphasizes the importance of recycling components, securing critical information, and preparing for future transitions while ensuring the safety and reliability of the decommissioning process.
E N D
Detector Decommissioning Related Activities at DØ George Ginther Fermilab and University of Rochester 2 March 2012
Recent Activities • Began nitrogen purge of VLPC cryostats on 23 January • Collision hall radiation survey completed on 24 January • Was previously posted as a radiation area • Now posted as a radioactive materials area • Nitrogen Dewar 39 empty as of 26 January • Suspended LN2 delivery to dewar 42 as of 1 February • Powered down calorimeter test stand as of 9 February • Pond water pressure loss on 10 February • Requested variance for DAQ nodes to support monitoring of SMT annealing • Transition nodes to SLF5 (and Clued0) and shutdown of other nodes in progress • Refrigerant recovered from Trane chiller • York chiller seals being repaired
Tours • During Collaboration meeting • For EDIT school • Re-using various components • 120 farm nodes moved to Clued0 • Helium purifier disconnected for NML CMTF • LN2 recapture system targeted for LAr35 • Portable dehumidifiers to SiDet • Preparing HV crate for MINERvA veto • Dryers and compressors for NOvA near detector APD purge • Relays, cables
Purging the VLPC cryostats(Analysis and plot by Russ Rucinski)
Current Status • Helium inventory in gas storage tank • Solenoid coil currently at 266K and warming • Calorimeters warming up (and will be for many months) • Evaluating potential re-use of argon inventory • Suspended delivery of liquid nitrogen • Wipe at transfer line filter • VLPC cryostat purge continues • AFE readout still powered • SMT chiller at 16C • SMT readout in standby awaiting additional annealing measurements • DAQ running unrecorded zero bias in auto-pilot until next SMT annealing measurement
As conditions (and resources) permit • Continue powering down rack infrastructure • Continue preparations of online computing cluster for transition to offline cluster • Identify, backup and archive critical information • Continue high bay preparations • Continue harvesting components for re-use • Continue preparations for basic exhibit • Shut down silicon chiller and purge system • Drain Deionized Chilled Water detector systems and purge • Secure halon fire suppression systems
Clean Out and Harvest • The mechanical crew is well into the process of preparing the DØ Assembly Building high bay to accommodate MicroBooNE TPC assembly
LAr 1 • 1 kiloton liquid argon membrane cryostat • About 16 times as much argon as used in DØ calorimeter cryostats