110 likes | 239 Vues
This document outlines the itinerary and meeting agenda for T. Gogami's travels across Germany and Japan in April 2011. It includes details of collaboration meetings, significant events such as The Great Earthquake news, and various analytical sessions focusing on KTOF TDC cut tests and KDC efficiency rates. Key findings and future tasks related to rate and efficiency analyses are summarized, highlighting trends observed in experimental data. The timeline specifies travel routes and locations including Frankfurt, Mainz, and Fukushima.
E N D
HES HKS meeting Lady justice 14/Apr/2011 T.Gogami 2/Apr/2011, Frankfurt, Germany
Itinerary Analysis (Tracking) • Newport News, US (JLab) • 2/01 Narita US • 2/27-28 HES HKS collaboration meeting, 4th JSPS core to core meeting • 3/11Norfolk Washington D.C. • The Great earthquake news when I woke up! • 3/12 Washington D.C Frankfurt • Mainz, Germany (Mainz Univ.) • 3/17-18 KaOS meeting in Mainz • Extend to stay in Germany ( 3/214/4 ) • Darmstadt, Germany (GSI) • 3/30 – 4/4 • 4/4 Frankfurt Narita • Fukushima, Japan • Tokyo(4/5) Fukushima(4/6) • Sendai, Japan • Fukushima(4/11) Sendai(4/11) Analysis (Rate , Efficiency), JPS Analysis code , Shift , cabling Meeting, Inside GSI
Contents • KTOF TDC cut test • KDC layer rates output
KDC hit wire selection code KDC1 KDC2 • GREEN regionSelective region • RED markers & linesSelected hit wires • BLACK markers & lines Rejected hit wires
KTOF TDC • Cut 10000 – 50000 (current) 18000 – 20500 (test) Run 76314 for CH2 target Run 77124 for 52Cr target
Results after KTOF TDC cut 2.0 [μA] , CH2 , 76315 7.6 [μA] , 52Cr , 77124 • After TDC cut Error • Analysis time ~20% reduction
KTOF TDC • Cur Region 2100 – 2400 (Accidental) 2600 – 2800 (signal) Run 76314 for CH2 target Run 77124 for 52Cr target
KDC DC Efficiency Rate
KDC Rate vs. Efficiency • Looks two tendencies • Applied voltages ? • Threshold ? Need to check Run sheet
Summary and to do • Summary • KTOF TDC cut • No bad effects for Number of Kaon • Analysis time is faster • Check sub peaks • Rate vs. Efficiency of KDC • Two tendencies Check KDC applied voltage and threshold • To do • HES • Tracking • Efficiency, Rate • E01-011 • 授業料免除 • RA • 学振 • 5/6 ----- 8/1 Germany • あと3週間で出発!
End 31/Mar/2011, Darmstadt, Germany