RPC GAS SYSTEM

RPC GAS SYSTEM. Commercial grade Gas :Do in-situ purification Regeneration must :Get back ~90% Fixed pressure control room: pressure at all points in room ~ 1mm (weather maker) Mixtures:3 Gas system (Each Module) + 1 Spare Safety :

Télécharger la présentation

RPC GAS SYSTEM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RPC GAS SYSTEM • Commercial grade Gas :Do in-situ purification • Regeneration must :Get back ~90% • Fixed pressure control room: pressure at all points in room ~ 1mm (weather maker) • Mixtures:3 Gas system (Each Module) + 1 Spare • Safety : • Level 1:RPC Safe :Level 2:People working and Level 3 : Everything • Main Gas Tetrafluoroethane (High density leading to ~60 primary electron-ion pair

  2. CERN Recirculation

  3. Fractional Distillation

  4. Gas Collection

  5. Gas Distribution • Mixed Gas

  6. Gas Requirement • For one Module : 64 RPC/Layer X140 Layer=8960~9K RPC Volume=200 X200X0.2=8000cc Total Gas = 8L/day (One volume/Day) 8000/24=333.33/60~=5.5 cc/min At least we need ~10 SCCM 10 X 9K== 90L/Min If 20% fresh gas ~18L/min=1080L/Hr=25920L/Day 1kg==220lts=25920/220=1080Kgs/day

  7. Gas Requirement Avalanche Mode : 95 % Freon 1kg Freon  220 L 8640L/Day 8640/220=39.27=~40Kg/day 1 cylinder k-size is 27.7kg then =~1.5 Cylin/day

  8. 1. CLOSED LOOP : Remove OF Water Vapour,O2halogens and silicons produced 2. TWO (ACTIVATED MOL. SIEVE + Copper WATER AND O2 ) 3. REGENERATION :HEATING 180deg. +FLUSHING WITH Ar + H2 (935/7%) 4. LEAK RATE OF CHAMBERO2 Removal PURIFIER

  9. RPC Tray