An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Level 1 Muon Trigger Status and Commissioning Rob McCroskey University of Arizona for the L1 Muon Group

  2. L1MU Hardware • MTCM (Crate Manager) • Production card testing in progress • MTCxx (Trigger Card) • Production cards beginning fabrication • MTFB (Flavor Boards) • Production MTM boards ready for fabrication • Production MTC10 board design in progress (finish in couple weeks) • Preproduction MTC05 board in fabrication • SLDB’s (Gbit/s Serial Links) • Production board testing in progress

  3. MCEN Hardware • MCCM (Crate Manager) • Preproduction card layout in progress • MCEN (Centroid Finder Card) • Preproduction card testing in progress • MCPB (Physics Boards) • Preproduction board testing in progress

  4. L1MU Infrastructure • Custom VME backplanes • Complete • Power supplies • Prototype assembled and tested • VICOR supplies ordered but with 20-22 week lead time • Platform services • On hold pending final cable plant design • Cabling • Production at Fermilab and NIU in progress

  5. Near Term Commissioning Goals • mid-August • Stable operation of one (sparse) L1MU trigger crate and the L1MU MTM crate • Still using preproduction cards • early October • Add L1CFT MTM crate to the above • mid-October • Begin commissioning production L1MU crates and cards Done Underway Underway Aiming for stable L1MU operation for commissioning by mid to late October

  6. Longer Term Commissioning Goals • Begin full crate testing in late December or early January • Two octant triggering until then • MCEN cards ~ 2 months behind above • Temporary power supplies for full crate tests