Detailed schedule pivot, bearing area specifications, support and platform installations, final assembly and magnetic field testing. In-depth equipment installations, detectors setup, cryo system maintenance, and division interactions. Acknowledgment of past achievements and addressing concerns for optimal operations.
E N D
Ep before • Coming out
Slow raster • Going in
Upside down girder before • Coming out
Upside down girder after • Going In
Long girder before • Coming out
Chicane after • Going in
Septum status • Final assembly and magnetic field testing
Spectrometer power supply list • Q1 regulation modules, opto couplers, right SCRs and coolant lines install SCR temp monitors, install control board extension cables • Q2/Q3 Opto couplers, retro fit new SCR banks, Right Q3 transistor replacement, install SCR temp monitors • Dipoles Replace SCRs, lead voltage polarity change upgrade, test spare ZFCT, troubleshoot lead voltage protection circuit, Flush cooling system, install new lead flow meter controllers, install SCR temp monitors
Detectors • Both HRS will be used for electron detections. • We will need for both arms to have :VDCs, S1/S2, Gas Cherenkov and Lead-glass Shower/Per-shower (pionrejectors). In addition, we plan to have a simple 3rd arm: • A small dE (thin scientillators, ~5mm) and E (Thick scinetillators, ~5 cm) detectors. It will be used for monitoring the product of the beam and target polarization by monitoring the elastic asymmetries.
Cryo system • Warm up both spectrometers • Pump all magnets • pump all cryo lines • Replace Q1 JT valve heads with JLab valves • Replace dipole LN2 probes • Replace magnet pressure gauges • Repair left Q1 leads • Replace left Q1 vacuum seals • Replace all Q1 110 vac plugs due to radiation damage • Calibrate Ln2 LL probes • Calibrate weka valves • Repair dipole He LL probe • Replace ball valves on magnet cryo bypass lines • Repair right Q2 LN2 valve • Remove Moeller U tube from pivot • Remove Y can from left Q1
LCW list with manifold pix • Hard manifold to BB power supply to new regulator and distribution manifold to accommodate Big Box and the FZ magnet power supplies. • New distribution manifold at the pivot to accommodate the FZ magnets and the resistor magnet
Power list • New power distribution box to accommodate FZ power supplies and target vacuum cart
Engineering Division Interaction • Interaction has been very good so far and I believe that we can maintain communication and coordination through the 7:45 and Wednesday meetings.
What we have done before • What we have done before • Installation of the septum magnet system (less the 3rd set of coils) • The septum support stand has been used several times • Target chamber used in Hall C • Target used in Hall C and reworked and tested in the Target lab
Concerns • Target operational readiness The effect of this is obvious. • Lock down of experiment parameters We still seem to be changing the experiment parameters. • LCW capacity due to 2 additional power supplies and 3 additional magnets We are adding another tap from the main line and 2 new manifolds on the old line but this needs to be looked at and we are working with Robin on this. We are also looking at boot pumps. • Alignment support This will be a bottleneck for everybody even with the resource leveling that was done and will need to be watched closely. • We will have major space constraints on the upper platform