This document outlines the ongoing design and fabrication efforts of the Experimental Beam Transport Team for the g2P/geP experiments in Hall A. Led by Stephanie Worthington, with contributions from Larry Munk and others, the team is focused on current beamline configurations, including the EP Pivot Superharp Girder and target calorimeter. The current status highlights the finalization of Region 3 magnet support structures, FZ2 movement mechanisms, and the planning for installation and delivery. Engineering support from various groups ensures progress and alignment with project goals.

major
Télécharger la présentation

EXPERIMENTAL BEAM TRANSPORT: g2P / geP Experiment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EXPERIMENTAL BEAM TRANSPORT:g2P / geP Experiment

  2. HALL A g2P/ geP EXPERIMENTAL BEAM TRANSPORT TEAM DESIGNERSFABRICATION • Stephanie Worthington -Lead Larry Munk • Danovic Spell SUPPORT GROUPS • Bruce Reinhart HALL A coordinator’s Team ENGINEERS Accelerator: Installation • L. A. Dillon-Townes Alignment • Marie Ivanco Vacuum • Shirley Yang Electrical Groups

  3. CURRENT BEAMLINE CONFIGURATION EP PIVOT Superharp Girder

  4. CURRENT BEAMLINE CONFIGURATION EP PIVOT Superharp Girder g2P/geP BEAMLINE CONFIGURATION 87.693 cm Target Calorimeter Pivot Slow Raster FZ1 & FZ2 REGION 5 REGION 3 REGION 2 REGION 1 REGION 4

  5. REGION1

  6. REGION 2

  7. UPSIDE DOWN GIRDER

  8. REGION 3

  9. CURRENT STATUS • Finalizing Region 3 Magnet Support Structures • Finalizing FZ2 movement mechanism • Finalizing delivery and installation plans