BLIP operations 5-25-10

BLIP operations 5-25-10. Status – running at ~180MeV BLIP weekly average beam increased to 92.3µA . Linac and BLIP measurements do not agree. Total operating time dropped to 155.8 hours due to maintenance time and replacement of RF mod 6. Operations issues

dominy
Télécharger la présentation

BLIP operations 5-25-10

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BLIP operations 5-25-10 Status – running at ~180MeV BLIP weekly average beam increased to 92.3µA . Linac and BLIP measurements do not agree. Total operating time dropped to 155.8 hours due to maintenance time and replacement of RF mod 6. Operations issues Research irradiation for Cu-67 development was successfully completed. Samples were distributed off site for evaluation to 3 investigators. Irradiation will continue at 180 MeV to irradiate the LBNE and standard isotope production targets until May 31. MCR will shut BLIP off at 9:00AM. End of production program. BLIP will restart June 1 with a brief Al foil irradiation at 117.5 MeV for a radiochemcial determination of absolute beam current using Na-24 monitor reaction. Immediately thereafter a 24 hour irradiation of test RbCl targets will be run at 117.5 MeV. On June 2 another 24 hour RbCl target test irradiation with octupole beam profile will be run. On June 3 a 1 hour research irradiation at 66 MeV with standard intensity profile is planned for development of Y-86 , followed by a 24 hour irradiation for Cu-67 development. End of run June 4.

More Related