francesca-murphy
Uploaded by
2 SLIDES
152 VUES
20LIKES

BLIP Operations Status Update: Running at 139 MeV with Beam Current and Irradiation Details

DESCRIPTION

The BLIP facility is currently operational at 139 MeV with an average beam current reaching up to 98.3 µA, peaking at 103.3 µA on February 26. The ion source has been challenged by a pulse timing issue that has reduced the effective pulse rate to below the anticipated 6.67 Hz, which is expected to be fixed during the next maintenance day. Research irradiation commenced on March 1, and there have been no target issues this week. Overall, the operations have been running for 161 hours.

1 / 2

Télécharger la présentation

BLIP Operations Status Update: Running at 139 MeV with Beam Current and Irradiation Details

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. BLIP operations 3-2-10 Status – running at ~139MeV BLIP average beam up to 98.3µA, with a high of 103.3µA on 2/26. Operation with beam 161hrs. Operations issues Ion source pulse timing problem has reduced effective pulse rate below the expected 6.67Hz. This will be corrected next maintenance day. No target problems this week Research irradiation at 139 MeVbegan 3/1.

More Related