An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ULS MARINE FUEL ”AT BERTH”SAFE ENFORCEMENT EMSA Meeting Lisbon, 15 October 2009

  2. MEETING WELCOMED! • Use of ULS MGO possible but it requires: • risk assessment on safe operations • eventual upgrades be completed • Stakeholders meeting much welcomed • Meeting suggested in 2003 & 2006 • No alternative than use of ULS MGO • AEA Study indentifies areas on which risk assessment is required

  3. ISSUES/CHALLENGES • Items to be addressed cover: • technical measures • operational measures, procedures & training • physical properties of the fuel • Challenges are related to: • technical solutions to be provided • supply of parts & upgrade completion • time frame to complete modifications • minimum required fuel viscosity? lubricity? • 0.1% fuel flash point temperature? Contamination (e.g. FEMA)?

  4. OIL TANKERS • Oil tankers calling at EU ports: ~ 2300 double hull tankers (OCIMF) of which ~ 1400 tankers with steam driven pumps (OCIMF) ~ 6000 port calls/year at EU ports (INTERTANKO) • Not all installations are alike • Upgrades: ”packages”, ”actual/individual”? • Tanker operators initiated the process • Expereince indicates time is short • Many tankers waiting for upgrades • > 8 months from initiation to completion of the work • Not sufficient upgraded by end of 2009

  5. WAY AHEAD • Enforcement with due regard to safety • Phase-in transition until 1 January 2011 • Oil tankers should document upgrades and measures were completed or initiated • Upgrades/measures according to risk assessments documented by service providers and confirmed by class/third expert party • SAFE ENFORCEMENT – no cutting corners!