1 / 2

01/07/08

Pretest station. Ilia Ravinovich. 01/07/08. I. Ravinovich. 1. Pretest station update. Three stacks have been installed, all three were stable. The first one showed gain increase and high gain Measurements: dV=470V, G=2034 dV=484V, G=3910 dV=497V, G=8165

Télécharger la présentation

01/07/08

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pretest station Ilia Ravinovich 01/07/08 I. Ravinovich 1

  2. Pretest station update • Three stacks have been installed, all three were stable. • The first one showed gain increase and high gain Measurements: dV=470V, G=2034 dV=484V, G=3910 dV=497V, G=8165 dV=511V, G=19090 The second one was stable dV=484V, G=1495 dV=497V, G=3266 dV=511V, G=5980 The second stack shows much less gain than the first one although the GEMs from he same 2007 production. 01/07/08 I. Ravinovich 2

More Related