1 / 22

eOperation in Hydro Oil & Energy

eOperation in Hydro Oil & Energy. Real Time Data from Drilling Operations - WITSML 1.2. Focus and Tools. Focus on key work process Ongoing drilling and well operations Production Tools Operation Centres (OPC) in Hydro Sandsli Rigs Offshore installations Collaboration tools

dympna
Télécharger la présentation

eOperation in Hydro Oil & Energy

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. eOperation in Hydro Oil & Energy Real Time Data from Drilling Operations - WITSML 1.2

  2. Focus and Tools • Focus on key work process • Ongoing drilling and well operations • Production • Tools • Operation Centres (OPC) in Hydro • Sandsli • Rigs • Offshore installations • Collaboration tools • Right time data • PDP • Real Time Data from Drilling Operations

  3. Hydro on the NCS and Sandsli Oilproduction ~ 900.000 bbl/day 25 % of Norways oilproduction

  4. OPC - Bringing it All Together

  5. OPC - Petec/Drilling Troll

  6. OPC - West Venture at Sandsli

  7. WITSML Right Time Data - Data from Different Worlds

  8. Update speed < 5 mins is accepable Operational Support (not Operational Control) Drilling and Well Operations WITSML WITSML Well Wellbore Trajectory Trajectory Station Log Rig Realtime bhaRun Right Time Data

  9. WITSML Flow in Hydro WITSML server WITSML server Halliburton WITSML Baker WITSML Service companies Service companies Hydro FW SiteCom - WITSML Client (Synchronizer) - Store WITSML • Publish WITSML - Administration Oracle C2K - SiteCome @ p216oracle01 Others • RMS • DrillWorks (Predict) • Bore OpenWire • Retrieve WITSML • Write GeoFrame (Open Spirit) • Alias and unit conversion • Append/Overwrite Bgoap10realtime2 • Windows 2003 Server • OpenWire (append) - OpenSpirit Client Hydro Metro - GeoFram Client - RMS Client - DrillWorks (Predict) - Bore Open Spirit • User session • Write GeoFrame osl076sun • OpenSpirit • GenEventSQL.pl • gfstatus GeoFrame GeoFrame

  10. WITSML Data in Hydro WITSML WITSML WITSML Connection to Connection to Connection to Service Halliburton Baker Anadril companies Sitecom WITSML WITSML Server DB Hydro RT Data Open Spirit OpenWire NH Inside Reality GeoFrame RMS existing (WITSML Loader ) systems IR - DB Geoframe DB RMS Files Geoframe IR - Geoviz Visualization - Wellpix .. - Wellplan ..

  11. Plus Central WITSML Server in Hydro SiteCom One place to handle WITSML interface to service companies Internal software, only one WITSML dialect SiteCom agents Splice log run Composite logs - Estimated trajectory station SiteCom monitoring SiteCom Alarm Manage Service company WITSML SiteCom WITSML New wellbores Splice/Composit log status Minus WITSML 1.2 - several dialects Software not original designed for real time data OpenSpirit, GeoFrame, Bore, RMS WITSML Data Model in Hydro New feature

  12. RMS WITSML Data Example

  13. RMS WITSML Data Example

  14. Service company Baker Haliburton Distributed use RMS DrillWorks (Predict) Data can differ on each individual user PC Central database GeoFrame Bore Same data on all PC’s Daily Check Points Service Company Drilling System RigLink (Baker) InSite (Haliburton) Service Company WITSML Server Hydro SiteCom WITSMl Server RMS WITSML data GeoFrame WITSML data 6 drilling operations on WITSML pr date Challange - Daily Monitoring

  15. Challange - Upgrade of a WITSML Server • Spring 2005 • WITSML server upgrade at Baker with some trouble • Fall 2005 • Hydro OPC Project: WITSML server to be upgraded without trouble!!!! • Hydro  Baker: Upgrade must be handled carefully at agreed time • Baker/Hydro: Agreed update at Wednesday 2005-11-09, depending on drilling activity. • Grane  Baker: NEW TOOL, UPGRADE NOW, PLEASE!!!! • Baker (service minded): • Upgrade notification Friday 2005-11-04 @ 07:11 AM • Estimated downtime 1 hour • Grane (et. all): WHERE IS OUR DATA? • Upgrade completed @ 06:12 PM

  16. WITSML - Large Saving Potential when Stable • Save users from loading data manually • Old • Survey + logs in to RMS • Download from Baker RigLink • Get data on correct format • Load survey file • Load log file • 2-3 hours for 2 people • New • Map WITSML data to well (select survey + log curves ) • Once for each wellbore • Hit monotoring button • 10 mins

More Related