Presented at the Stakeholder Meeting Mike Herrmann, NCEEP Central Watershed Planner

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Phase I Activities – Status & Draft Results Presented at the Stakeholder Meeting Mike Herrmann, NCEEP Central Watershed Planner September 16th, 2008

  2. Phase I Activities & Products Objective: Begin Characterizing Watershed Conditions Process: • Field and GIS inventory • Delineate and characterize drainages • Assess Functions • Form stakeholder group • Review existing Monitoring data Products: • Critical data gaps identified • Goals for the LWP • Potential hotspots & projects • Monitoring & fieldwork plans • Preliminary Assessment Report

  3. Phase I Assessment Habitat Assessment Factors • Diverse aquatic & terrestrial communities • Forested riparian areas, floodplains • Abundant aquatic microhabitat • Stable streambanks • Diverse channel substrate • Terrestrial travel corridors that promote wildlife movement • Minimally fragmented forest • Adequate resources (food, shelter, and community) • Does not endanger or threaten native species.

  4. Phase I Assessment Water Quality Assessment Factors • Chemicals, pathogens, and sediments in streams. • Monitor stream biology (i.e., bugs and fish) as a long-term indicators of water quality. • Meeting designated use (e.g., Aquatic life, recreation, or water supply). • Hospitable streams for aquatic life (e.g., good riparian habitat

  5. Phase I Assessment Hydrology Assessment Factors • Effectively transporting water and sediment. • Vertically stable (i.e. Low bank-height ratios to allow access to floodplains) • Laterally stable streambanks • Riparian zones promoting groundwater recharge and sediment deposition. • Higher base flows and lower peak flows.

  6. Phase I Assessment Habitat, Hydrology, & Water Quality Indicators

  7. Phase I Assessment Assessment Unit - Subwatersheds • Provides a better spatial characterization of conditions within the Local Watershed Plan (LWP) area • Gives a context to compare areas within the LWP • Helps establish the need and type of follow-up fieldwork needed to more completely assess the subwatershed. • Criteria based on size, stream order, and land cover.

  8. Phase I Assessment Subwatersheds Min. Size - 1.3mi2 Max. Size - 5.3mi2 Avg. Size - 3.4mi2

  9. Phase I Assessment Land Cover • Updated 1996 NC Land Cover using 2005 aerial imagery • Minimum Mapping Unit of 4 acres • 6 Land Cover Categories

  10. Phase I Assessment Land Cover

  11. Phase I Assessment Habitat High Quality Habitat • Significant Natural Heritage Areas & Natural Heritage Element Occurrences • Interior Forest Cover (300 feet from forest edge) • Forested Wetlands & Hydric Soils • Forested Floodplains/Riparian Areas Hexastylis naniflora (Dwarf flowered Heartleaf). Forested Riparian Corridor, Lower Indian Creek

  12. Phase I Assessment Habitat – Draft Results High Quality Habitat

  13. Phase I Assessment Habitat High Quality Riparian Conditions • Typically 3000 feet or longer • Wide (>200 ft.) contiguous forested stream buffers • Mature riparian forest cover • Adjacent to an SNHA Forested Riparian Corridor, Mill Creek

  14. Phase I Assessment Habitat – Draft Results High Quality Riparian Conditions

  15. Phase I Assessment Hydrology Forested floodplain & riparian area • FEMA delineated 100-year floodplains • Headwaters riparian zones (90ft) • Forest & shrub considered “Forests) 100-year floodplain Floodplain Conditions, Middle Indian Creek

  16. Phase I Assessment Hydrology – Draft Results Forested floodplain & riparian area

  17. Phase I Assessment Water Quality Impacted Streams • Highly altered streams (e.g., channelized, denuded buffer) • 1000 ft or greater in length • Identified from aerial photography Impacted Riparian Zone, Tributary to Lower Indian Creek

  18. Phase I Assessment Water Quality – Draft Results Impacted Streams

  19. Phase I Assessment Water Quality Impacted Wetlands & Hydric Soils • Impacted NWI wetlands, hydric soils (Worsham) & visibly wet areas • Reduced capacity to filter runoff and trap sediments. • Impacts include ditching, removal of vegetation, cattle access • Identified from aerial photography Impacted Hydric Soils-Adjacent to South Fork

  20. Water Quality – Draft Results Phase I Assessment Impacted Wetlands & Hydric Soils

  21. Phase I Assessment Watershed Assessment – Draft Results • Habitat – Limited areas of high quality habitat • Hydrology – Conditions slightly better in Indian Creek than Howard’s • Water Quality • Indian Creek watershed impairment • Howard’s Creek compares poorly with Indian Creek for riparian & wetland conditions • Limited Monitoring Data • Subwatershed Functional Assessment – To Be Completed

  22. Phase I Assessment Phase II Planning ENTRIX, Inc Contracted for Fieldwork Support: • Stream Preservation • Wetland Restoration • Stream Restoration • Stormwater BMPs • Agricultural BMPs

  23. Phase I Assessment Phase II Planning • Finalizing Monitoring Plan • Developing Fieldwork Plan • Entrix under contract to complete the following assessments

  24. - - - - - - - - - - Project Timeline Planning Process Begins Winter 2008 Form Stakeholder Group Monitoring Begins Develop Preliminary Findings Summer 2008 Phase 1 Activities End Fieldwork (Stream, Wetland, Stormwater, Ag BMPs) Data Analysis/Summaries Winter 08/09 Water Quality, Biologic Monitoring Monitoring Summary Report Watershed Finding Reports Phase 2 Activities End Summer 2009 Final Reports • Atlas of Project Sites • Final Assessment and Recommendations Final Public Meetings Phase 3 Activities End Winter 09/10 Plan Implementation