1 / 8

NC-ITEC

NC-ITEC. Update-Fall 2000. Mission Statement. Provide technology evaluation and testing services to the Internet 2 community. The two main constituencies are: The Abilene NOC – the lab responds to issues raised by the NOC involving code and functions currently deployed in Abilene.

Télécharger la présentation

NC-ITEC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NC-ITEC Update-Fall 2000 John P. Streck John H. Moore

  2. Mission Statement • Provide technology evaluation and testing services to the Internet 2 community. The two main constituencies are: • The Abilene NOC – the lab responds to issues raised by the NOC involving code and functions currently deployed in Abilene. • Internet 2 Engineering – the lab provides an environment for testing new code and features before they are deployed in Abilene. John P. Streck John H. Moore

  3. NC-ITEC Structure • Present locations • Cisco lab in RTP • Expansion space in MCNC lab • Future additional locations 2Q01 • NC State Centennial Campus in Spirent Communications lab John P. Streck John H. Moore

  4. NC-ITEC Structure –cont. • Connectivity • Cisco lab to NCNI • Presently OC-12 over dark fiber • In progress DWDM over dark fiber • Staff support • NCNI • Cisco • Spirent John P. Streck John H. Moore

  5. ITEC Lab setup • Multiple GSR 12000’s • Access routers and switches • Test equipment (traffic generator/analyzers) • Remote test access (virtual lab setup) • Video/audio application traffic source • Test result and configuration archives John P. Streck John H. Moore

  6. Recent & Current Work Items • Staging for SC 2000 QoS demo • EFT lab test for MPLS-GB • Regression test of IOS FR code problem • CAR performance testing • MDRR functional assessment • Unicast RPF function & performance test • “Smoke test” of debug IOS image John P. Streck John H. Moore

  7. Upcoming Plans • Increase size of test bed to develop parallel testing capabilities • Improve the lab infrastructure to provide a more efficient environment for both local & remote testing • Increase the size of the lab staff to better service requests from the Abilene NOC and I2 Engineering John P. Streck John H. Moore

  8. NC-ITEC Support Staff • John Moore (NCNI) -associate technical director • Lee Graham (NCNI) -test engineer (p/t) • Jitendra Lal (NCNI) -test engineer (p/t) • Katie Cantrell (Cisco) -test engineer (p/t) • Tsegereda Beyene (Cisco) -networking consultant • Michael Lynge (Spirent) -test tool support manager • Bill Cerveny (AN&S.) -test engineer (remote) John P. Streck John H. Moore

More Related