1 / 9

WECC Reliability Based Control Field Trial

WECC Reliability Based Control Field Trial. NERC Draft Standards BAL-007 – BAL-011. Overview. Background PWG/SDT role/responsibilities, Scope, and Time Frame BA role/responsibilities RC role/responsibilities Issues Questions. Background. Draft BAL-007 – BAL-011

elisa
Télécharger la présentation

WECC Reliability Based Control Field Trial

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WECCReliability Based ControlField Trial NERC Draft Standards BAL-007 – BAL-011

  2. Overview • Background • PWG/SDT role/responsibilities, Scope, and Time Frame • BA role/responsibilities • RC role/responsibilities • Issues • Questions

  3. Background • Draft BAL-007 – BAL-011 • RBC – Frequency based ACE Limit • EI Field Trial underway for 2-3 years • 14 BAs with 60% of load • “No” modifications to BA EMS’ • Waiver of CPS2 compliance requirement • Draft under review/revision with new posting in next couple of months

  4. WECC FT – Control,Scope,Time • Administered by PWG with assistance from SDT • All data will be collected, analyzed by PWG or WECC Staff, and forwarded to SDT • PWG will establish WECC interconnection specific data collection requirements • PWG will establish participation requirements, SDT will maintain list of participating BAs • PWG/SDT will review regularly review data and, if necessary, will consult with BAs on withdrawal from FT • PWG will survey BAs regarding readiness for FT • WECC FT will last 1 calendar year, after which performance per the Standard will be reviewed

  5. BA execution of RBC in WECC FT • All BAs with Peak Load or Max Gen > 500 MW must participate • All BAs must be able to meet the data collection reporting requirements • While CPS2 is waived, it must still be calculated • BAL-007 – a frequency based ACEclock-min limit (BAAL) with a 30 min time limit • No EMS modifications are required and BAs may “loosen” control BUT • BAs must still continue to calculate and report all required quantities.

  6. BA execution of RBC – cont’d • BAs must provide explanation and examples of interfaces Operators will use for RBC compliance • BAs can self-implement the BAAL calculation and monitoring of ACE or use tools provided by the SDT • The SDT tools are for monitoring only and reference the ACE history (e.g. a PI database)

  7. RC participation in WECC RBC FT • RC has authority to direct participating BAs to take corrective action if the RC observes problems it believes may be attributed to the BA operation under the FT. • RC, PWG, SDT will conference call to assess such situations. • The WECC FT document details specific RC actions for different limit violations

  8. Issues and Concerns • There is no CPS2 (L10) limit • PWG proposes an ACE “cap” of 2*L10 beyond which BAs will be expected to reduce ACE within the cap after some duration. • Should the FT run concurrent with other major control changes? • It’s not clear if a BA is allowed to continue to control for ACE, in any manner, while ACE is within the BAAL. Discussion is continuing. • PWG understands that anonymity of the BA to the SDT is required as CPS data is involved. • The resources to collect and analyze FT data is more than PWG can provide. PWG recommends a WECC staff resource

  9. Questions?

More Related