Asia-Pacific Partnership. on. Clean Development and Climate. Reliability. Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007. R.M. Kovach – FirstEnergy. Reliability – High Level View.

evan-mills
Télécharger la présentation

Reliability

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Asia-Pacific Partnership on Clean Development and Climate Reliability Asia Pacific PartnershipUnited States of AmericaPower Generation Task ForceAugust 13 – 17, 2007 R.M. Kovach – FirstEnergy

  2. Reliability – High Level View • Pumped-Storage reliability plays a key role in allowing the FirstEnergy generation portfolio to produce cost competitive electricity in a safe and environmentally friendly manner. • This presentation provides a behind the scenes view of how reliability is achieved at FirstEnergy’s pumped hydro stations. Reliability 2

  3. Reliability – Monitoring Motor/Generator & Pump/Turbine Vibration Readings PDA Readings Temperatures Magnetic Flux Transducers Stator High Potential Testing Air Gap Monitoring Lubricating Oil Analysis NDE Reliability 3

  4. Reliability – Balance of Plant Transformers Piping Oil Analysis Video Inspections Transformer Testing Cast In Place Piping Civil Works Visual & Sonar Inspections Weirs Piezometers Reliability 4

  5. Vibration Analysis & Thrust Measurement • Bentley Nevada transducers are used. • Axial thrust plus 3 bearings are monitored. • Continuously monitored. • Data displayed and stored on Yokogawa system. Reliability 5

  6. Temperatures • Various air, water and oil temperatures are monitored. • Continuously monitored. • Stored and displayed on Yokogawa system. Reliability 6

  7. Lubricating Oil Analysis • Oil samples are taken from Guide Bearings and Thrust Bearing on the pump/turbine. • Oil samples are taken from other large motors. • The analysis is done by an in-house laboratory. • Items analyzed for include: water, viscosity, foreign material. • Tested every six months. 7

  8. Thermography • Performed by in-house group. • Only performed on electricalequipment. • 14.4 kv and above unless anissue is suspected. • Conducted annually. Reliability 8

  9. Non Destructive Evaluation • Performed by outside vendor. • Dye penetrant tests are conducted on runner vanes. • Performed twice a year. Reliability 9

  10. Air Gap Monitoring & PDA • Performed by outside vendor. • Equipment is permanently installed. • Performed annually. Reliability 10

  11. Civil Works – Weirs & Piezometers • Piezometers are manually read. Data is logged into an Excel spreadsheet. • Weirs are a combination of manually read and recorded 24/7. • Visual inspectionsconducted twicea week. Reliability 11

  12. Civil Works – Seneca Inspections • One of the first Upper Reservoir’s to use a Remotely Operated Vehicle (ROV) in the U.S.. • One key to success was navigational andside scan sonar. • Second key was knowing the exactlocation of the ROV at all times. • Upper Reservoir is visuallyinspected twice a year. • Upper Reservoir is surveyedtwice a year. Reliability 12

  13. Piping • Facility is built primarily with concrete, unlike a fossil station which uses structural steel. • Significant amount of piping is embedded in the concrete. • Video inspection is being utilized more as the piping ages. • Aggressively pursuingtechnologiessuch as cast in placepiping (CIPP). Reliability 13