1 / 10

Results to date

Results to date. as of November 4, 2008 45 projects completed or still committed. Results to Date – 45 Projects. Average savings/project, kWh: Average incentive/kWh: Average compressor size: Avg savings as % of baseline, kWh*: Average system demand for air as percent of full load:. 42,448.

fausto
Télécharger la présentation

Results to date

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Results to date as of November 4, 2008 45 projects completed or still committed

  2. Results to Date – 45 Projects • Average savings/project, kWh: • Average incentive/kWh: • Average compressor size: • Avg savings as % of baseline, kWh*: • Average system demand for airas percent of full load: 42,448 $0.158 31.2 hp 39% 41% * Applies to first group of 29 projects. Update on second group not included.

  3. Sensitivity Check – Inlet Mod

  4. Sensitivity Check – Load/Unload

  5. Results to Date – Compressor Count by Size Average Size = 31.2 hp

  6. Results to Date – Vendor Participation

  7. Results to Date – Baseline Compressor Control Type 63% inletmodulation 40% inletmodulation 31%load/unload 60%load/unload 22% of projects 78% of projects “New Construction” “Retrofit”

  8. Results to Date – System Loading Average load on system is 41% of compressor full load acfm capacity.

  9. Results to Date – Runtime Overall average: 5,315 hours/year

  10. Results to Date – Part Load Curve

More Related