Annual Flat Start Case Build Process in ERCOT: Dynamic Model Management Overview

This document outlines the proposed annual process for building Flat Start cases in ERCOT, focusing on dynamic model management and data compilation. Resource Entities (REs) will submit all dynamic models and parameters through the Resource Adequacy Reporting Framework (RARF) to ERCOT. ERCOT will communicate updates to Transmission Service Providers (TSPs) and collaborate with REs to resolve any concerns. Additionally, this process aims to comply with NERC MOD standards (MOD-026-1, MOD-027-1, MOD-025-2). Future changes may be necessary as standards evolve.

Télécharger la présentation

Annual Flat Start Case Build Process in ERCOT: Dynamic Model Management Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Dynamic Model Data Management ERCOT SYSTEM PLANNING

  2. Current Process Annual Flat Start Case Build TSPs DWG ? =? REs ERCOT RARF

  3. Proposed Process • Resource Entities (REs) submit all dynamic models and parameters through RARF to ERCOT. • ERCOT will inform TSPs about the updated model and parameters. • TSP and ERCOT will work with REs to resolve any concerns on the submitted model and parameters. • ERCOT will be a single source to collect and compile all REs’ dynamic models and parameters and provide the data set to DWG for flat start base case creation.

  4. Proposed Process: Flat Start Case Build Creation DWG Periodic Updates TSPs REs ERCOT RARF Resolve model and parameter concerns

  5. Draft of NERC MOD Standard • MOD-026-1, MOD-027-1, MOD-025-2 • These draft standards applies to Generator Owner and Transmission Planner • Considering RARF is the adopted process in ERCOT region to collect all the model data, potential changes may be required in the future once these standards become effective

  6. Potential changes: for NERC MOD-26-1, MOD-27-1 RARF with accepted model and parameters Flat Start Case Build Creation REs ERCOT DWG Updated Models and Parameters Acceptance Notification TP

  7. Next Steps • Discuss with DWG • Pilot? • DWG Procedure Manual Changes?