1 / 6

NPA-OPS 57A Electronic Navigation Database Management

NPA-OPS 57A Electronic Navigation Database Management. Presented by Daniela Defossar, EASA Operations Officer, Flight Standards Department, Rulemaking Directorate, OST 07-2, 21-22 May 2007 Gatwick, UK. SUMMARY . NPA summary Text enhancements after 2 nd OST review (OST -6-5).

francesca
Télécharger la présentation

NPA-OPS 57A Electronic Navigation Database Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NPA-OPS 57A Electronic Navigation Database Management Presented by Daniela Defossar, EASA Operations Officer, Flight Standards Department, Rulemaking Directorate, OST 07-2, 21-22 May 2007 Gatwick, UK EASA Flight Standards Rulemaking

  2. SUMMARY • NPA summary • Text enhancements after 2nd OST review (OST -6-5). • Conclusions EASA Flight Standards Rulemaking

  3. NPA Summary • JAR-OPS 1 alignment with amendment 29 to ICAO Annex 6 Part I • Need to consider type 2 LoA (Letter of Acceptance) or alternative processes to demonstrate data integrity by the data suppliers • Operators’ responsibility to ensure that they obtained Nav DB, used on board as primary means of navigation, by a supplier holding an type 2 LoA EASA Flight Standards Rulemaking

  4. NPA summary • NPA published for public consultation 1 June 2006 - 1 September 2006 • CRD and modified text proposal were reviewed at the last OST (07-1) • OPSG and EQSG have exchanged some further texts enhancements • EQSG states that all are technically equivalent EASA Flight Standards Rulemaking

  5. CONCLUSIONS • OST is invited to review EQSG Chairman’s WP 07-2. • OST is invited to consider that EQSG preference is option 2. • The current NPA contains EQSG’s preferred option with paragraph JAR-OPS 1.873 (b) aligned with type 2 LoA process. Type 2 LoA is not an approval but a ‘Letter of Acceptance’. • OST is invited to adopt it for further process by RST and final ASC and JAAC adoption. EASA Flight Standards Rulemaking

  6. Thank you for your attention EASA Flight Standards Rulemaking

More Related