An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Voltage Control in Power Systems:Preliminary Results Automatic Control Laboratory Swiss Federal Institute of Technology (ETH) T. Geyer, G. Ferrari-Trecate, M. Morari in collaboration with Mats Larsson ABB

  2. Optimal Control Problem Subject to • Dynamics (in MLD form): • Soft constraints on bus voltages :

  3. Receding Horizon Control • Optimize at time t (with new measurements) • Only apply the first optimal move u(t) • Repeat the whole optimization at time t +1 • Advantage of on-line optimization: Feedback!

  4. Tuning of Cost Function • Violation of soft constraints is penalized by: • Choose weight R on u such that: No constraint violation: nominal control: > ultc voltage reference > capacitor bank Constraint violation: emergency control: > all controls including load-shedding

  5. Preliminary Results

  6. Conclusions • Control problem: • MPC is able to stabilize the load voltage V4m with N=2 and Ts=15sec without using load-shedding • solution time 8sec..2min (PC with 1GHz) • but: there remains a control error • Outlook: • observer • model reduction • reachability analysis • large-scale problem