110 likes | 382 Vues
Oliver Pietz. DB International GmbH. DB International GmbH ДБ Интернациональ ГмбХ Your Partner for the Projects in the railway sektor Ваш п артнер для ж/д проектов. Oliver Pietz. Berlin, September 2012. DB International GmbH – Introduction.
E N D
Oliver Pietz DB International GmbH
DB International GmbH ДБ ИнтернациональГмбХ Your Partner forthe Projects in therailwaysektor Ваш партнердля ж/д проектов Oliver Pietz Berlin, September 2012
DB International GmbH – Introduction Marshalling Yards– Our Reference Project DB International GmbH
DB International - integrated rail-bound transport solutions Rail Consulting Business Consulting Management consulting in the context of an overall railway system, mobility and logistics; from strategy and concept consultancy through to profitability analysis and process optimization System Consulting Technical consulting for integrated and interdisciplinary solutions for all modes of transport Logistics Idea Conzept Design Realiza-tion Oper-ation Management • Engineering Design, project management and construction supervision of infrastructure projects relating to railway specific subjects for structural engineering, equipment engineering and geotechnics DB International GmbH 4
DB International — always close to our clients Moscow Vilnius Utrecht Warsaw Berlin Belgrade Bucharest Zagreb Tbilisi Beijing Algiers Xi´an Amman Doha Taipei Abu Dhabi Jeddah Rio de Janeiro Johannesburg Offices DB International DB International GmbH
DB International GmbH – Introduction Marshalling Yards– Our Reference Project DB International GmbH
Technical Supervision of Modernisation of Marshalling Yard Vaidotai on International Transport Corridor IX (Lithuania) Status quo before Project start • Marshalling Yard was built in 1980‘ies • Third braking position missing • In meantime equipment worn-out,hump control system obsolete • Insufficient number of arrival and departure tracks • Missing tracks for handling of heavy freight trains (6000 t)
Technical Supervision of Modernisation of Marshalling Yard Vaidotai on International Transport Corridor IX (Lithuania) Project Goals • Lithuanian Railways contracted consortium of Siemens AG Braunschweig / Siemens Lithuania / ThyssenKrupp (later SONA BLW) for construction and installation works and supply of equipment (ca. 30 Mio Euro) • Contract started in 2005, putting into operation September 2009, removal of defects until January 2012 • Yard equipped with three retarder positions and automatic microprocessor-based hump control system MSR32 of Siemens • Construction of 8 new tracks and extension of two tracks for 1050 m useful length • Improvement of drainage system, power supply and radio systems as well as environmental aspects • System considers specific conditions of heavy cargo traffic on Russian road gauge • Now Vaidotaiis the most modern shunting yard in Eastern Europe.
Technical Supervision of Modernisation of Marshalling Yard Vaidotai on International Transport Corridor IX (Lithuania) Activities of DB International • Role of FIDIC Engineer according to international standard for construction contracts • Construction supervision as to requirements of Lithuanian construction law • Check and approval of technical and working design • Quality control on site • Inspection and acceptance of works and equipment • Claim management • Contract management
Thank you very much for your attentionСпасибо за внимание Oliver PietzDirector Middle- and Eastern Europe/CIS DB International GmbHElisabeth-Schwarzhaupt-Platz1, 10115 BerlinTel. +49 30 6343-1300 DB International GmbH