gazit
Uploaded by
15 SLIDES
276 VUES
150LIKES

Enhancing Louisiana Education: Key Recommendations for Improved Student Outcomes

DESCRIPTION

This document outlines actionable recommendations to strengthen Louisiana's education system. Key strategies include raising graduation requirements by requiring a fourth year of math, implementing the LA Core Curriculum to align student coursework with college admissions, and enhancing career and technical endorsements. The introduction of End-of-Course (EOC) Tests aims to improve academic rigor and ensure consistency across high school courses. Additionally, a focus on dropout prevention, dual enrollment, and recovery programs addresses the needs of at-risk students.

1 / 15

Télécharger la présentation

Enhancing Louisiana Education: Key Recommendations for Improved Student Outcomes

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Phase 2 Recommendations

  2. Recommendation 1 • Increase the Graduation Requirements • Require a 4th year of math for all students • Highest level of math attainment-strongest predictor of BA attainment • Well-paying jobs that earn living wage and allow for career advancement require math, problem solving and reasoning skills

  3. Recommendation 2 • Implement LA Core Curriculum to better prepare students for college and/or careers • Connects curriculum to admissions to most colleges • Coursework qualifies students for TOPS Tech/TOPS Opportunity • 4 years of math, science, social studies/social sciences and English • Flexibility to allow students to earn IBCs • Coursework in LA Core required for entry to LA 4-year colleges

  4. Recommendation 2 (cont’d) • LA Core Curriculum • Require all students to enroll in LA Core beginning with 9th grade class of 2008-09 • Students may “opt out” of LA Core • After completion of Grade 10 • Must have parental/guardian permission • Must have valid reason • Expand LA Virtual School

  5. Recommendation 3 • Strengthen Louisiana’s Career and Technical Endorsement • Align Career and Technical Endorsement with TOPS Opportunity • (See Handout)

  6. Recommendation 4 • Implement End-of-Course Tests to Improve Rigor and Consistency of HS Courses • Replace GEE with EOC Tests aligned with LA’s Comprehensive Curriculum • More reflective of the curriculum taught • Help improve the consistency and rigor of courses across the state • Tests begin with Algebra I in 2007-2008 • Tests begin to “count” with 9th Grade Class of 2009-10

  7. Recommendation 4 (Cont’d) • Implement End-of-Course Tests • To graduate, student must have “verified credit” in English and Math and either Science or Social Studies • A credit is verified when student passes EOC test • State will offer at least 2 EOC tests in each of the core subject areas • All students must pass Algebra I EOC Test • Students will have multiple opportunities to pass

  8. Recommendation 4 (Cont’d) • Implement End-of-Course Tests • Three performance levels • Fail • Pass (upper range of “Approaching Basic”) • High Pass (upper range of “Mastery” or standard required by Higher Ed for placement/credit purposes) • EOC test results must be included in student’s course grade with BESE setting minimum %age • Accountability Commission to recommend how to integrate EOC tests into HS Accountability, beginning with 9th grade class of 2009-10

  9. End-of-Course Tests Implementation Schedule *Bold indicates the initial year of the EOC Test.

  10. Recommendation 4 (Cont’d) • Implement End-of-Course Tests • Funds Needed for Implementation • Test Development and Administration • Teacher/Student Supports • On-line tutoring – begin with Math • Professional development for teachers • On-line summer institutes – begin with Math • Technology funds for High Schools • Support on-line EOC Tests, distance learning, video conferencing and smart classrooms

  11. Recommendation 5 • Modify the Graduation Index • Encourage more Dual Enrollment and Articulated Credits • Encourage more IBCs • Encourage more AP Coursework

  12. Commission Recommendation: Graduation Index

  13. Recommendation 6 • Support Dropout Prevention and Recovery • 9th Grade Initiative • $5 million 8(g) over 3 years • Target 40-50 High Schools/9th grade focus • Credit recovery/remediation • Target 9th graders who are falling behind • Other Programmatic Efforts • Literacy and Math Catch Up Curriculum • Lighthouse Schools

  14. Questions

More Related