An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Readiness Coordinator Network June 26, 2014

  2. Agenda • Status of MIS / EBT Implementation • Clinic Enablement • Site Surveys Update • Change Management – Preparing WIC Families 6/26/14

  3. Status of ImplementationCeres • Status of Pilot DO Selection • Work continues by state staff Vermontizing Ceres: a/k/a “configuration” • Data Conversion continues on DO records • Beginning to analyze how Ceres and EBT will affect clinic flow, assignment of duties in DOs and at clinic • Orientation of state staff in all Ceres clinic and state admin functions by Ciber 6/26/14

  4. Status of ImplementationEBT • We have a contract with Xerox for EBT • DFS also contracted with Xerox for 3Squares, so our fruit and veggie card OK until EBT rollout • Work has begun validating that Ceres is set up correctly to “interface” with Xerox online EBT • Next task is working with grocers to interface with Xerox XEROX CERES GROCERS 6/26/14

  5. Implementation Schedule • June 2014 – Sept 2014 • DII installs server system to host Ceres and AHS builds Test Database • Ciber (Ceres) and Xerox (EBT) test the interface between the MIS and EBT • VDH works on configuring (Vermontizing) Ceres • Sept 2014 – Dec 2014 • Ciber and Xerox internal testing • VT IT completes internal testing of all software and systems • Xerox works with Retailers on EBT enablement • Introduce WIC families to upcoming changes • Jan 2015 – May 2015 • User Acceptance Testing (UAT) – Help Desk, state staff and selected DO staff will be trained and participate. • End to End Testing • Pilot preparations • May 2015 – Sept 2015 • PILOT and Pilot Evaluation • Roll Out preparation (set up eqpt, distribute cards, materials, clinic checklist completion; schedule for phase out of home delivery; etc) • Oct 2015 – March 2016 • ROLL OUT to each DO • 12 waves, two weeks each 6/26/14

  6. Pilot and Roll Out Schedule • Prior Week – DO data converted from legacy system to Ceres • Week One – prep and training • DII Desktop Services set up and test clinic workstations and peripherals • Clinic training – 4 days classroom, 1 day mock clinic • Staff free from all other work during this time - No clinics scheduled • Classroom is onsite in DO; Each trainee has their own laptop/workstation • Training is functionally based: learn by doing actual tasks • DO data converted from legacy system to Ceres • Week Two – roll out • “Light load” appointment scheduling • Longer time for appointments • Time in between to prepare for next appointment • Support staff on site to help all week • SuperUsers (trained during UAT, tested system) in each DO • Week Three and Beyond • Continuing support from SuperUsers, state staff, Help Desk • Continue “light load” appointment scheduling for 1-3 months 6/26/14

  7. Change Management: Preparing WIC Families • “Branding” the WIC EBT Card • Branding includes both naming and design • Promoting A.D.K.A.R. • Awareness – Desire – Knowledge – Ability - Reinforcement • What will EBT and retail delivery mean to families? • Positive aspects of this change; ways to build comfort and desire for change • Naming the WIC card: what are your thoughts? • Reports from the DOs 6/26/14

  8. Next Steps • PLEASE promote the Mini-Demos – • easy to watch from any workstation with access to Nessie folders • no more than 5 minutes each • Run automatically – click and watch a slide show with audio track • Topics • Ceres and BF Peer Counselors • Ceres and Data Integrity (How Ceres help make sure data entered is accurate, and that all necessary information is gathered for a correct certification) • Ceres Automates Growth Charting • Adding a new baby to Ceres • Reports available from Ceres • Producing a VOC • \\Nessie\cph\Common\WIC\Ceres_Demos • Next Month: More Discussions about Preparing WIC Families 6/26/14

  9. Next RCN Meeting: June 26 12:30 pm-1:30 pm • If you will miss the meeting, please review the meeting materials and contact us with any questions and suggestions • http://healthvermont.gov/wic/ReadinessCoordinatorNetwork.aspx • Lynne Bortree lynne.bortree@state.vt.us • Jeanne Keller jkeller@keller-fuller.com 6/26/14