Objective AOP05. Objective AOP05. Comprehensive Explanation Link to European ATM Master Plan Most important SLoA(s) Finalisation Criteria and Closed Questions Supporting Material ESSIP Report 2012 Objective Coordinator’s Analysis, recommendations, tips & tricks Conclusions
E N D
Objective AOP05 • Comprehensive Explanation • Link to European ATM Master Plan • Most important SLoA(s) • Finalisation Criteria and Closed Questions • Supporting Material • ESSIP Report 2012 • Objective Coordinator’s Analysis, recommendations, tips & tricks • Conclusions • Links and contacts September 2013
Comprehensive Explanation Implement Airport Collaborative Decision Making (CDM) • This objective aims at implementing A-CDM to enhance the operational efficiency of airports and improve their integration into the Air Traffic Management Network (ATMN) while maintaining or improving the safety levels; • The applicability area is presented in Table 8 of Part IV Annex B of the ESSIP 2012 document; • Initial operational capability - 01/2004, Full operational capability - 01/2016 September 2013
Link to European ATM Master Plan • [AO-0501]-Improved Operations in Adverse Conditions through Airport Collaborative Decision Making; • [AO-0601]-Improved Turn-Round Process through Collaborative Decision Making; • [AO-0602]-Collaborative Pre-departure Sequencing; • [AO-0603]-Improved De-icing Operation through Collaborative Decision Making; • [DCB-0301]-Improved Consistency between Airport Slots, Flight Plans and ATFM Slots; • [DCB-0302]-Collaborative Management of Flight Updates; September 2013
Most important SLoA(s) • APO01/ASP01/USE01- Define and agree performance objectives and KPIs at local level specific to airport operations in accordance with A-CDM Manual guidelines; • APO02/ASP02/USE02 - Define and implement local airport operations procedures for information sharing through Letters of Agreement (LoAS) and/or Memorandum of Understanding (MoU) in accordance with A-CDM Manual guidelines; • APO03/ASP03/USE03 - Define and implement local procedures for turnaround processes in accordance with CDM manual guidelines (baseline CDM); • APO05 Define and implement the exchange of messages, Flight Update Message (FUM) and Departure Planning Information (DPI) between CFMU and the airport in accordance with A-CDM Manual guidelines; • APO06/USE05 Define and implement procedures for CDM in adverse conditions including de-icing according to airport CDM Manual guidelines. September 2013
Most important Finalisation Criteria • APO01/ASP01/USE01 - Agreed list of performance objectives and KPIs; • APO02/ASP02/USE02 - Agreed LoA or MoU signed between the Airport CDM Partners; • APO03/ASP03/USE03 - Agreed local procedures for turnaround processes; • APO05 - FUM and DPI messages exchanged with CFMU; • APO06/USE05 - CDM procedures established in adverse weather conditions; September 2013
Supporting Material • EUROCAE-ED-141-Minimum Technical Specifications for airport Collaborative Decision Making (Airport-CDM) Systems, dated October 2008; • EUROCAE-ED-145-Airport-CDM Interface Specification, dated October 2008; • EUROCAE-ED-146-Guidelines for Test and Validation Related to Airport CDM Interoperability, dated October 2008 Url: http://boutique.eurocae.net/catalog/index.php September 2013
Supporting Material • EUROCONTROL-Airport CDM Functional Requirements Document, Edition 4.0, dated May 2009; • EUROCONTROL-Airport CDM Implementation Manual, Edition 4,0, Dated 01.04.2012 Url : http://www.euro-cdm.org/library_eurocontrol_implementation.php • ETSI-EN303 212, V1.1.1 - Airport Collaborative Decision Making (A-CDM); Community Specification for application under the Single European Sky Interoperability Regulation EC 552/2004, dated 01.06.2010, OJ 2010/C 168/04 Url : http://webapp.etsi.org/workprogram/SimpleSearch/QueryForm.asp September 2013
ESSIP Report 2012 September 2013
Objective Coordinator’s Analysis, recommendations, tips & tricks • Information/data are missing for some of airports within the applicability area; • More elaborate explanation of chosen progress assessment is required September 2013
Links and contacts • Objective Coordinator: PredragVranjkovic, +32 2 729 3257 predrag.vranjkovic@eurocontrol.int • DNM Objective Expert: Paul Adamson, +32 2 729 5183 paul.adamson@eurocontrol.int September 2013