An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Notus Clean Energy LLC Wind Turbine GeneratorPre-Bid Meeting Boreal Renewable Energy DevelopmentFerriter Scobbo & Rodophele PCOutback EngineeringRichard C. Gross, Inc. March 12, 2009

  2. Presentation Overview • Project Summary/Background • RFP Structure • Goals / Preferences • USDA / MTC Requirements • Specific Item • Pending issues • FAA • Interconnection • Building permit • Questions not yet covered • Site Walk

  3. History - Highlights • 2005: • Feasibility Study • 2006: • MTC Design & Construction grant • 2007: • Local by-law changes to allow wind turbines in areas zoned light industrial • USDA 9006 grant awarded • 2008: • All permits / approvals acquired • Green Communities Act – Allows for net metering • RFP issued • FAA approval rescinded • 2009: • Interconnection application submitted • Pre-Bid Meeting

  4. Site Plan

  5. Ownership Structure • Notus Clean Energy, LLC will own the turbine • Float Realty Trust owns the land & building • The turbine will be interconnected behind-the-meter at 82/100 Technology Park Drive • Currently leased to Teledyne Webb Research

  6. Goals & Preferences • Largest turbine feasible • Maximize output (renewable energy is good) • Economies of scale • Behind-the-meter • Net metering now allows for near retail rates

  7. Structure of Proposal • 1) EPC services • 2) O&M services • Strongly prefers bundled proposal, but will accept separate EPC and O&M proposals • Additionally, D&B alternative using the Vestas V82 • “Under the D&B Alternative, Notus would enter into a WTG purchase agreement with the MTC and immediately assign its rights and obligations under that agreement to the successful Bidder.” • All the above except potential procurement of the V82 from the MTC on a turnkey basis

  8. Basis of Award • Competitive negotiation • “Negotiations are normally conducted with more than one of the Bidders. Discussions and bargaining are conducted with a view to reaching agreement on the technical quality, price, other terms of the proposed contract and specifications.” • Criteria for award is defined in 2.2 • Experience is implicit items (c) O&M contractor and (d) Project Completion Date

  9. EPC Scope of Services Highlights • Procure / supply 0.9 to 1.65 MW wind turbine • Take over design • Electrical interconnection work with Richard Gross • Acquire local building permit and roadway permits • Transport, site prep, site security during construction, install, SCADA • Start-up, testing & commissioning of turbine and SCADA system • Acceptance Test (proposed by contractor) • Optional elevator

  10. EPC Scope of Services Highlights (2) • Warranty 5 years • Optional additional 5 years • Availability or Power Output Guarantee • Liquidated damages • Substantial completion by a specified date requirements

  11. D&B Alternative • EPC Obligations less • Turbine procurement • Turbine transport to site, including permits

  12. EPC / D&B Pricing / Payment / Contract • Pricing • Lump sum not-to-exceed • Open book basis • % of profit to Bidder • Not-to-exceed cap • Payment • Based upon achievement milestones • 15% reserved until Final Acceptance • USDA requires use of EJCDC contract documents • USDA has provided $300,000 grant

  13. O&M Highlights • 5 year warranty • Option for evergreening • Remote monitoring • Responsible for Warranty / Power Output • Establish & maintain spare parts • Train Notus staff & provide documentation

  14. Pending Permits / Approvals • Permits / Approvals Notus is working on: • FAA • NSTAR interconnection for a V82 • Assume if this is approved NSTAR will approve smaller turbines • Notus pays NSTAR Interconnection costs • Contractor is required to acquire • Building permit • Roadway permit (not if V82 D&B) • NSTAR Interconnection, if not a V82

  15. Proposals • Due 4:00 pm March 27thTom Michelmanc/o Boreal Renewable Energy Development43 Margaret StreetArlington, MA 02474tmichelman@boreal-renewable.com

  16. Questions / Site Walk • Questions before the site walk • Site walk • Opportunity for additional questions post site walk