HIGH SPEED RAIL 2

HIGH SPEED RAIL 2. Mandy Walker Warwickshire County Council Jan 2011. What is it? . Long term transport project 10-30years National strategic infrastructure linking major cities in north with south Potential boost to gva and economic performance. What does it involve ?.

glynis
Télécharger la présentation

HIGH SPEED RAIL 2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HIGH SPEED RAIL 2 Mandy Walker Warwickshire County Council Jan 2011

  2. What is it? • Long term transport project 10-30years • National strategic infrastructure linking major cities in north with south • Potential boost to gva and economic performance

  3. What does it involve ? • Euston to Birmingham – 150km - no stops in Warwickshire • Direct link to Heathrow , as well as Europe via HS1. • Interchange station near NEC / BIA • Birmingham station at Curzon St , east side • Maintenance depots – preferred location for Midlands, Washford Heath • Transfer Station – 3 possibly one in Warks. • Onward Y network to Leeds and Manchester

  4. Route through Warwickshire

  5. National benefits • Reducing the N/S divide • Increasing GVA • Improving connectivity btwn major cities in North and London/ Europe • Providing strategic national infrastructure • Reducing travel times to 40 mins btwn B’ham & Manchester, 65 minutes B’ham - Leeds. • Reduce carbon emissions by up to one million tonnes a year by 2055.

  6. Regional benefits • Generate £5.3b in economic benefits, over 60 years to WM region ( including shires) • Support employment growth in WM - up to 60,000-70,000 jobs by 2040 (re location of jobs) • Support increase in GVA by 6% by 2040

  7. Benefits to Warwickshire ?

  8. Current Status December 15th NWBC Council • Opposes HS2 • Recommends consultation is deferred • Work with and support other LA’s/local MP and communities December 14th WCC Full Council 14th Dec • opposes HS2 as no environmental or economic benefits for the County • recommends consultation is deferred • Work with other LAs/action groups to provide coordinated opposition December 20th Ministerial Announcement • route option recommended in March – most appropriate general alignment • some tweaks but none significantly affecting Warks

  9. Latest timetable • January 2011 discussions with HS2 Ltd re consultation f • February –July 2011 HS2 Ltd’s Consultation process • Late summer 2011- publication of line from B’ham-Manchester/Leeds • July- December 2011 HS2 Ltd analyse consultation responses & publish proposed route & strategy • March 2012 Consultation on route north of B’ham • October 2013 1st hybrid Bill goes to Parliament • 2015 HS2 enabling works start • 2017 Completion of Cross Rail

  10. WCC Next Steps • Coordinating with LAs along route • Regular liaison with Action Group reps • Ongoing dialogue with HS2 Ltd • Once consultation starts will consider impact on Warwickshire including: noise, environmental, landscape, ecology, archaeology,rights of way economic, freight, classic rail , highway infrastructure impact • Mitigation requirements • Compensation requirements • Formal WCC response to consultation

  11. Questions? www. warwickshire.gov.uk/hs2 www.dft.gov.uk/pgr/rail/pi/highspeedrail/proposedroute/maps www.hs2.org.ukl email HS2@warwickshire.gov.uk