An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Future of Infrastructure Investments Carter H. Strickland, Jr. Commissioner, New York City Department of Environmental Protection March 7, 2013

  2. Hurricane Sandy

  3. Hurricane Sandy Flooding Area

  4. Monthly Maximum Water Levels at the Battery 15 • 9:24 PM – Manhattan Battery • 13.88 feet • Mean Lower Low Water • 11.10 feet • North American Vertical Datum 1988 14 Sandy 13 12 11 Previous Record March 1962 10 December 1992 Hurricane Irene 9 8 7 North American Vertical Datum 1988 (feet) 6 5 4 3 2 Monthly High Water 1 0 -1 -2 1920 1930 1940 1950 1960 1970 1980 1990 2000 2010 2020 Years Courtesy AECOM

  5. Sandy Impacts on Pumping Stations

  6. Manhattan Pump Station Con Edison Substation Manhattan Pump Station

  7. Sandy Impacts on Wastewater Treatment Plants

  8. Oakwood Beach Wastewater Treatment Plant

  9. Wastewater Response Coney Island WWTP 49th Street Pumping Station 26th Ward WWTP

  10. Climate Change Planning at DEP

  11. 10-Year Capital Plan • $14.4 billion 10 Year Capital Budget • $3.3 billion for Wastewater Treatment Plant Upgrades • $2.4 billion for Sewer Construction • $1.8 billion for State of Good Repair Programs • $730 million for Green Infrastructure

  12. DEP’s Capital Priorities 2012-2016 • Initiate Staten Island Siphon construction ($250M) • Complete sewer connections in Queens ($396M) and Staten Island ($380M) • Bring Bluebelts to southeast Queens to naturally control stormwater($29M) • Complete connections to City Water Tunnel No. 3 ($898M) • Initiate Green Infrastructure related projects ($187M) • Complete repairs to the Manhattan Pump Station ($227M) • Continue planning for Delaware Aqueduct repair – Water for the Future ($1.7B*) Staten Island Bluebelt Shaft Connections for Delaware Tunnel Repair – Water for the Future Connections to Water Tunnel No. 3 * $1.7 B is the total projected cost for Water for the Future, including design and construction, as well as alternative sources and conservation measures

  13. Grey Infrastructure Investments Paerdegat Basin CSO Facility Newtown Creek WWTP More than $10 billion in wastewater investments since 2002 • $5 billion – Newtown Creek Wastewater Treatment Plant upgrade • $437 million –Paerdegat Basin CSO Facility • $500 million – Hunts Point Wastewater Treatment Plant upgrade and nutrient removal • $100 million – Nitrogen control upgrades at 26th Ward, Coney Island, and Rockaway wastewater treatment plants

  14. Climate Change Impacts on NYC Source: New York City Panel on Climate Change

  15. GreenInfrastructure Green Roof Blue Roof Bioswale Porous Pavement 15

  16. The Green Strategy Costs Less

  17. Right of Way Bioswale

  18. Area-Wide Approach

  19. For more information visit www.nyc.gov/dep Follow us on facebookat www.facebook.com/nycwater