1 / 6

CNRAD installation summary

CNRAD installation summary. Key dates Installation have been performed from 2 nd to 4 th of March. CNGS setup with beam started on the 15 th of March (so today !) End of beam foreseen on the 21 st of November.

grazia
Télécharger la présentation

CNRAD installation summary

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CNRAD installation summary • Key dates • Installation have been performed from 2nd to 4th of March. • CNGS setup with beam started on the 15th of March (so today !) • End of beam foreseen on the 21st of November. • Next access will be between the 29th and the 31st of March (to be defined)

  2. CNRAD installation summary BLM detectors Station1: 3 CB50 for high voltages 2 optical fibers 1 CB50 for Remote Reset LED warning signs Station3: 1 NE48 Station4: 1 Ethernet connection for Webcam 1 CB50 for remote reset of the webcam Camera located below Station4 where the radiation field should be low enough to avoid radiation damage DerivFIP Station2: 1 Profibus used as a FIP Station3: 1 NE48 TE/EPC Station1: 1 NE48 (only for 1st Slot?) Lanbda or Astec ?

  3. CNRAD installation summary Next access between 29th and 31st of March BLM detectors Station1: 3 CB50 for high voltages 2 optical fibers 1 CB50 for Remote Reset Cryo (Fip based) Station2: 1 NE48 Station3: WorldFIP PCI 1 MHz LED warning signs Station3: 1 NE48 Station4: 1 Ethernet connection for Webcam 1 CB50 for remote reset of the webcam Camera located below Station4 where the radiation field should be low enough to avoid radiation damage DerivFIP Station2: 1 Profibus used as a FIP Station3: 1 NE48 TE/EPC Station1: 1 NE48 (only for 1st Slot?) Next Slot: 1 NE48 (setup for IGBTs ?)

  4. CNRAD installation summary Monitoring of the PMI chamber positions for comparison with RadFETs: RP placed dosimeters (RPL, Alanine, ECBs) In the target area Dose expected at the end of 2011 (Considering 1.5e18 pot/week) 26.5 kGy (1 kGy < TID < 5 kGy) per Slot RM10 Dep (100 nm + 400nm) PMI 406 PMI401: At the junction chamber in the target Area. Dose expected at the end of 2011 (Considering 1.5e18 pot/week) 175 Gy Off-line Measurement 2 RadFETs (100 + 400 nm) PMI403: Between TSG42 and TSG43 in the target Area Dose expected at the end of 2011 (Considering 1.5e18 pot/week) 15 kGy Off-line Measurement 2 RadFETs (100 nm) PMI 407 Close to old position 452, on the wall RM11 box 5V Dose expected at the end of 2011 (Considering 1.5e18 pot/week) 380 Gy (15 Gy < TID < 60 Gy) per Slot RM11 Dep (100 nm + 400nm)

  5. CNRAD installation summary Position of the RadMONs during the 1st Slot RM10 dep 400nm + 100nm PMI 406 RM7 dep BLM position Facing TSG45 400nm + 100nm RM8 box (3V) Facing TSG45 (90°) 1000nm Close to the camera RM9 box (5V) Below DerivFIP module Facing TSG45 400nm + 100nm PMI 407 RM10 box (5V) To recalibrate the position Facing TSG45 (45°) RM8 dep LED position 400nm RM11 box (5V) RM11 dep Facing TSG45 400nm + 100nm RM7 box (3V) Facing TSG45 (90°) 1000nm in short circuit To be read at the end of each slot

  6. CNRAD installation summary • RadWG website has been updated for 2011 (see CNRAD tag) • New webpage for summarising the ongoing tests including links to reports if they exist ! • CNRAD data interface is under maintenance • Questions: • What is the pressure of the ≠ BLM chambers ? • Possibility to have online values of the BLM chambers during irradiations ? • TE/EPC → 4 AC/DC to be tested (Lanbda or Astec ?) → Only 1 for the 1st slot → Planned to stay only one slot ? • Next slot • Setup for the IGBTs (TE/EPC) ? • Cryo should be ready.

More Related