An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PROJECT: OLD MAIN BY: REYLNNE BECCA STEVEN MANDY

  2. MISSION • A Potential Water Harvest for Old Main • How to Incorporate the Surrounding Buildings • Storage Requirements

  3. WATER HARVESTING FOR OLD MAIN USE OLD MAIN TO IRRAGATE PLANT LIFE

  4. THE FOUNTAIN Old Main’s Fountain will be used to Water the lawn surrounding the building Try to find a set monthly Schedule to drain and irrigate water to lawn.

  5. NEIGHBORING BUILDINGS We recommend using the Social Sciences and Caesar E Chavez Buildings These Buildings have the Capability of irrigating the 2000sq/ft turf area

  6. PROCESS OF OBTAINING WATER Apply a roof “catchment” system to the buildings Drain watercaught, into a storage unit Hold water in storage unit to be used throughout the year for watering the turf area.

  7. PROBLEM After collecting water from roof tops, we plan on running pipes under the the ground into an irrigation system for the turf area

  8. Table 2  A  B  C  D  E  F  G  H IRRIGATION Roof area sq. ft. 26385 HARVESTED REQUIREM. NET * Turf area in sq. ft. 2000 ET turf Precip Irr. Require. Storage sq. ft on turf ET-precip Harv-Irr. 1287 Cu. Ft from ET Turf 2000 2000 for sq.ft. turf Precip. 26385 2000 Cu. Ft. cu.ft. Month ft. cu.ft. ft. cu. Ft cu. Ft. cu. Ft. January 0.09 2309 0.17 347 175 172 2137 14620 February 0.08 2199 0.21 428 167 262 1937 16557 March 0.07 1869 0.35 696 142 555 1314 17871 April 0.04 945 0.47 937 72 865 80 17952 May 0.02 418 0.58 1155 32 1123 -706 17246 June 0.02 528 0.61 1230 40 1190 -662 16584 July 0.15 3892 0.53 1065 295 770 3122 3122 August 0.15 3870 0.47 932 293 639 3231 6353 September 0.08 2089 0.42 847 158 689 1400 7753 October 0.07 1781 0.34 673 135 538 1243 8996 November 0.05 1429 0.21 420 108 312 1118 10113 December 0.09 2485 0.15 303 188 115 2370 12483 TOTAL 0.90 23812 4.52 9034 1805 7229 16584 SOCIAL SCIENCIES BUILDING

  9. Table 3 A  B  C  D  E  F  G  H IRRIGATION Roof area sq. ft. 14872 HARVESTED REQUIREM. NET * Turf area in sq. ft. 2000 ET turf Precip Irr. Require. Storage sq. ft on turf ET-precip Harv-Irr. 2112 Cu. Ft from ET Turf 2000 2000 for sq.ft. turf Precip. 14872 2000 Cu. Ft. cu.ft. Month ft. cu.ft. ft. cu. Ft cu. Ft. cu. Ft. January 0.09 1301 0.17 347 175 172 1130 6829 February 0.08 1239 0.21 428 167 262 978 7807 March 0.07 1053 0.35 696 142 555 499 8306 April 0.04 533 0.47 937 72 865 -332 7974 May 0.02 235 0.58 1155 32 1123 -888 7086 June 0.02 297 0.61 1230 40 1190 -892 6193 July 0.15 2194 0.53 1065 295 770 1423 1423 August 0.15 2181 0.47 932 293 639 1542 2966 September 0.08 1177 0.42 847 158 689 489 3455 October 0.07 1004 0.34 673 135 538 466 3920 November 0.05 806 0.21 420 108 312 494 4414 December 0.09 1400 0.15 303 188 115 1285 5700 TOTAL 0.90 13422 4.52 9034 1805 7229 6193 CAESAR E CHAVEZ

  10. MISSION: COMPLETE