1 / 27

The Republic of the Union of Myanmar Ministry of Electric Power

The Republic of the Union of Myanmar Ministry of Electric Power. Present & Future Power Sector Development in Myanmar. Place - Naypyitaw Date - 27-2-2013. Policies . Policies. To employ the available energy resources in power generation for the sufficient supply of electricity.

hali
Télécharger la présentation

The Republic of the Union of Myanmar Ministry of Electric Power

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Republic of the Union of Myanmar Ministry of Electric Power Present & Future Power Sector Development in Myanmar Place - Naypyitaw Date - 27-2-2013

  2. Policies

  3. Policies • To employ the available energy resources in power generation for the sufficient supply of electricity. • To promote the effective and efficient use of electricity for future energy sufficiency, reserves and sustainability in our nation. • To conduct the reliable power quality to be supplied safely. • To enhance the electricity distribution system to be developed in accordance with the advance technologies. • To adopt the environment-friendly ways in electricity generation, transmission and distribution. • To encourage the expansion of power transmission and distribution throughout the country and the Public-Private-Participation in each sector. • To get millennium achievements, besides of constructing of thermal power plants, have to construct more hydro power plants yearly by the least of EIA and SIA, whereas hydro power is the clean and renewable energy.

  4. Present Condition

  5. Organization Structure of Ministry of Electric Power Ministry of Electric Power (MOEP) Department of Hydropower Planning Myanma Electric Power Enterprise Electricity Supply Enterprise Yangon City Electricity Supply Board Hydropower Generation Enterprise Department of Electric Power Department of Hydropower Implementation Transmission Generation Distribution Generation System Operator

  6. Current Generation Facilities Of Power System Tapein 240MW် Shweli-1 600MW Thaphanseik 30 MW Sedawgyi 25MW Yeywa 790MW Kyunchaung 54.3 MW Zawgyi-2 12MW Kinda 56 MW Zawgyi-1 18MW Mone 75MW KengTawng 54MW Tigyit 120MW KyeeOhnKyeeWa 74MW Man 36.9 MW Bluchaung-1 28MW Paunglaung 280MW Shwetaung 55.35MW Bluchaung-2 168MW Hydro Power Plant Khapaung 30MW Gas Power Plant Kun 60MW Myanaung 34.7MW Steam Power Plant Yenwe 25MW Shwekyin 75MW Zaungtu 20MW Hlawga 154.2MW Thaketa 92 MW Ywama 70.3MW Thaton 50.95MW Ahloneံ 154.2MW Mawlamyaing 12MW

  7. Current Transmission & Distribution Facilities of Power System Transmission Facilities Distribution Facilities

  8. Demand Forecasting and Situation for Short Term Period during 2013 to 2016

  9. Demand Forecast • Increased rate will be 15% based on peak load (1790) MW of 2012 year. • Demand for industrial zones and special economic zones is not included.

  10. Demand & Supply Condition in 2013 If there is no additional generation from new power plant, power shortage will be about 500 MW (25% shortage) in Dry Season. Thermal power is the best solution to reduce power shortage because it is not depend on season and establishing time saving as well. Therefore, priority to establish gas engine power plant and gas turbine power plant.

  11. Demand & Supply Condition in during 2013 to 2016 (MW)

  12. To be Completed Power Plant Projects during Year 2013 to 2016 (MW) 11

  13. Transmission Line & Substation Projects during Year 2012-13 to 2015-2016

  14. Distribution Line & Substation Projects during Year 2012-13 to 2015-2016

  15. Demand Forecasting and Project Implementation for the Long Term Period during 2016-17 to 2030-31

  16. Planned Target for Long Term Yr.(2011-12) to Yr.(2030-31)

  17. Generation Plan to Fulfill the Demand from year (2016-17) to (2030-31) (MW)

  18. Generation Plan for Long Term

  19. Power Plant Projects in Northern Side Yenam Kaunglanghpu Pisa Wutsok Gawlan Lasa Lawngdin Wxhonhgze Chibwe Hkankwan Myitsone Tongxinqiao Chibwengae Natabat

  20. Power Plant Projects in East & North –East Side Tapain(2) Konlong(Upper Thanlwin) Shweli(2) Naung Pha/Mantaung Nankha Keng Tong Wantapeng Heku Mongwa Solu Keng Yan

  21. Power Plant Projects in North-West Side Htamanthi Mawlight Kalaywa (Coal) Shwesaryae Manipu

  22. Power Plant Projects in South-East Side Mong Tong(Upper Thanlwin) Htukyan Hanna His-Hsone Thakya Natabat(Kayar) Palaung Pekon Bawlakae Ywathit Hutgyi

  23. Power Plant Projects in Western Side Sinedin Laymyo Laymyo(2) Thahtay

  24. Power Plant Projects in Southern Side Pharpon Yangon (Huanenglancang) Zinkyauk Kawkareik Yangon (Virtue Land) Mudone Dawei Tanintharyi

  25. Transmission Plan during Year 2016-17 to 2030-2031

  26. Distribution Planduring Year 2016-17 to 2030-2031

  27. Thank You