An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Disaster Recovery Steve Bearden The Prism Partnership

  2. What We Will Cover • Why Disaster Recovery Planning • Prevention: Key Design Strategies • Preparation: Contingency Planning • Recovery: Putting It Back Together Three Threads of Data Privacy & Security

  3. Why Disaster Planning? A good Disaster Recovery Plan (DRP) can save guest experience, revenue and resources. An effective DRP will: • Minimize potential economic loss • Reduce disruptions to operations • Ensure organizational stability • Provide an orderly recovery • Protect the assets of the organization • Ensure the safety of personnel and guests • Minimizing decision-making during a disastrous event

  4. Who’s Doing It Right? In a survey conducted by Comdisco, Inc., one of the largest disaster recovery companies, it is estimated that: • 45% of companies maintain a formal DRP • 12% have an effective DRP • 6% are partially prepared • 82% are ineffectively prepared for a technology disaster

  5. What Goes Wrong?

  6. Data Center DR Design • Location – avoid water and public areas • Security – proper access policies • Climate – independent HVAC on generator • Fire – dry pipes • Power – clean power on UPS and Generator

  7. Operations DR Design Power to strategic locations is key – Front Desk, Restaurants, Housekeeping, PBX….

  8. Outsource??

  9. The Plan Every hotel has different characteristics: • Systems • Location • Flag Programs Therefore: Every plan should be property specific

  10. Plan Documentation • Plan ownership – IT/Operations • The Plan should be documented in written form, with hard-copy printed versions readily available to hotel management in strategic locations • Know your processes and have forms & supplies available to operate manually • Detailed systems design – document make and model of equipment and software for easy restoration or remote site conversion

  11. Know Your Equipment

  12. Communications • Notification list • Contingency Team – Escalation List • Key management / Alternates • Home / Cell • Emergency contacts • Sample letters from Management

  13. Vendor Management • Vendor contact escalation list • Have vendor contracts available • Maintenance contracts / SLA’s • Ensure appropriate severity levels in your contracts to meet contingency expectations • Alternate Location – corp offices, sister property or “Hot site” hosted location?

  14. Backup Data! • Data Backup • Tape or Optical • Off-Site Storage • Remote backup across internet to hosted backup service? • Real time? • Save at least two recent generations of back-up (i.e., last night and last week) • Store in a fireproof safe in a remote location • Back-ups should be periodically verified • Test restores periodically

  15. Backup Reports • Run PMS contingency reports hourly • Spool them to a Laptop • Sample chronological control reports: • All guests in-house, checked-out or expected today with balance • Every room in the hotel with the current occupancy status • Expected arrivals/departures for next five days • A room availability report

  16. PMS Reports

  17. Contingency Supplies Contingency operations require paper forms and supplies • Laptop w/contingency forms • Pre-printed Registration cards • Room status log • Reg card / Folio “buckets” • Credit card imprinters • CC Authorization terminal • Generator / Measured business line • Calculators • Flashlights Forms and supplies should be stored in a secured location with ready access when needed

  18. The Outage • When an outage occurs, the Manager On Duty should first alert the Contingency Team • The contingency team leaders meet ASAP to determine type of outage • Brief Outage < 6 Hours • Short term - > 6 hours < 2 days • Long Term > 2 days

  19. Brief Outage < 6 Hours • Contingency team will alert the management team and affected departments • Department management will call in more staff – front desk, housekeeping coordinators, night audit, accounting • Distribute copies of the most recent contingency reports – (copier on emergency generator) • Distribute radios to key personnel, especially if telephone service is affected

  20. Brief Outage < 6 Hours • Distribute contingency supplies • Centralize the room inventory function with a single individual located at or near the Front Desk, essentially a “rack clerk” to assign rooms for arrivals and coordinate with Housekeeping • Update the Contingency Reports with all arrivals, departures, etc as they occur • As guests check-in, advise PBX to enable outbound calls • Centralize the revenue/F&B posting function with a single individual

  21. Short term - > 6 hours < 2 days Implement brief outage procedures plus: • Letter from the General Manager to all guests • Alert staff to come in early and plan to stay late • Transcribe beginning balances from Contingency Reports and all room charges to hard copy guest folios • Use pre-printed folio forms for contingency Operations • Maintain room status sheet from the contingency reports

  22. Short term - > 6 hours < 2 days • Use a laptop (on generator) to maintain an Excel worksheet to facilitate changing statuses – FD / Housekeeping • Maintain constant communications with Housekeeping • Distribute updated telephone lists with arrivals and departures for operators • Prepare for a manual Night Audit • Post room and tax manually to the paper folios

  23. Short term - > 6 hours < 2 days • Manually create housekeeping assignment sheets during the Night Audit for housekeepers • As checkouts occur, settle the balances manually • Advise guests that the system is down and that a copy of their folio will be sent to them after the system is restored • Be certain to capture addresses and email to honor this commitment • Each cashier needs to balance their cash and credit card receipts to their cashier’s report at the end of their shift

  24. Long Term > 2 days Implement brief & short term procedures plus: • Continue updating revenue and status forms in laptop or on manual forms • Establish a room revenue control sheet in Excel to capture room revenue as it is posted by hand to the hard copy folios • Use this sheet, plus the room charge control sheets to generate a basic revenue report

  25. Long Term > 2 days • Secure current availability and expected arrivals reports from the CRO • Store all control sheets (Arrival/Departure; Posting; Cashier Control; Room Revenue) in an accordion file by day to facilitate recovery processes

  26. POS / Restaurant If just PMS is down, settle checks to “House” If POS down: • Issue a small supply of checks to servers recording the serial numbers • Consider going to a limit menu or buffet • Make CC Authorization terminal available (generator / analog line) • Remind kitchen personnel to make meals only from the soft copies • Use cashiers rather than allowing servers to self-cashier

  27. POS / Restaurant • Adjust both staffing and guest expectations accordingly • Have cashiers maintain a manual control sheet (cashier’s report) for all closed checks by meal period or shift • After each shift, reconcile the used checks with kitchen dupes and unused checks • Beverage outlets should draw a line under each drinks order as they make it • Bartenders record immediate sales over the bar onto a single control sheet • Alternatively, instruct bartenders to do a “blind drop”

  28. Locking System Maintain an inventory of contingency key cards, often called “fail-safe keys” • Keep secure but available • 3 generations • Log in and out

  29. Telephone System Outage • Power fail bypass trunks • Analog telephones – patch panel? • Letter to guests • Post floor monitors

  30. Interfaces Down • Check guests into PBX • In-room Entertainment – Enable Movies • Call Accounting – Post only $$ calls? • Watch the buffer – old calls to new guests? • Voice mail or manual? • If VM, check out guests for next guest

  31. Recovery • Restore backup tapes • Input all sequential activity and charges • Enter data from backup-forward • check in/out - run night audits • Post charges • Continue to operate manually until data restored

  32. Remote Site (Yikes!) If the hotel must be closed then you need to get your remote site operations underway. • Set Up “War Room” for contingency communications • Set up telephone center and network • Staff remote site • Reroute hotel/reservation call traffic • Get equipment ordered as needed • Install PC’s and distribute supplies • Set up and load most recent PMS backup

  33. Test Test Test Your DRP Annually At a minimum!

  34. Questions?