An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Indian RailwaysCOAL INFRASTRUCTURE RINKESH ROY DIRECTOR TRAFFIC TRANSPORTATION Railway Board 22ndJune2012

  2. COMMODITY & EARNING SHARE 2011-12

  3. Current Strategy for freight business • Key drivers of the current strategy • Increasing the axle load from 20.3t to 22.9t & now to 25 t on mineral routes – • Extend to all routes • Develop wagons for 25T • Targeted investments on low cost but high return traffic facility works • Efficiency Improvements - Better WTR • Tariff rationalisation and Dynamic Pricing policy • Freight Unit cost brought down from 71 paisa per NTKM in 2000-01 to 63 paisa in 2007-08 • Wagon turn round improved from 6.7 days to 5.0 days

  4. COMMODITY-WISE PROJECTIONS (XII PLAN)

  5. SHARE OF COMMODITIES BY TERMINAL YEAR OF XI PLAN AND BY TERMINAL YEAR OF XII PLAN 1. * Share of Coal is expected to go up. 2. $ Iron-ore for exports to come down.

  6. Identification of Growth Areas • In absolute terms maximum growth expected in coal. • Picture of domestic coal production:-

  7. Identification of Growth Areas

  8. Coal • Fast development in the Power sector. Need to move more coal during the XII Plan. • Additional capacity =82325 MW of coal based power generation. • 9320 MW =pithead based and 10660 MW =shore based. • Balance 62345 MW will require transportation of coal through Indian Railways. • Power sector analysis gives total coal movement=740 MT by 2016-17. • Production analysis gives total coal movement =700 MT by 2016-17. • Increased movement from Captive mines and Port. • Policies to promote connectivity. • Development of infrastructure in the form of track capacities on major coal bearing routes. • Development of last mile connectivity to coal blocks and newly developed mines.

  9. Challenges FOR the Railways during the XII Plan Period • 40% increase in freight traffic from the terminal year of the XI Plan to the terminal year of the XII Plan. • Traffic to double if we consider passenger traffic. • To be carried on existing infrastructure without DFC. • Incremental of 80 MTPA as against best ever of 65 MTPA • Throughput enhancement works other than DFC have to be prioritized for completion on an urgent basis. • EAST-WEST AND NORTH-SOUTH DFC TO START • Proliferation of 25 t/30t axle load running for iron ore. • Raising the current axle load regime from 22.82 tonnes to 25 tonnes. • INDUCTING 25T WAGON FOR COAL +14-17% EXTRA

  10. Coal Routes Requirement 2010-11 & 2016-17 • NDLS DFC and doubling of B route via Lucknow + Shivpur Tori for Captive DFC- for Imported 32 MT/53 MT CCL, ECL, BCCL • HWH • MUMBAI

  11. Rewari Doubling 3rd line between Champa - Jharsuguda Alwar Mathura HWH New line required between Korba-Annupur+ Connectivity to Raigarh-Mand KORBA Strengthening MCL IB MUM • HWH MCL TLHR +25 3rd line MOU-GOL No work planned between Durg-Nagpur 3rd line between Durg to Bhattapara MAS

  12. Jhansi Third line between Bina and Bhopal +14 • KATNI NCL DL BINA-KOTA +44 SECL/CIC BYEPASS- Anuppur SECL/KORBA DL BSP-APR • BSP WCL Champa BYEPASS

  13. BYEPASS DL JSG R HWH Mum TLHR +20+Captive Haridaspur – NL DL TIG PRDP 3/4 LINE UPTO VSKP VZM No planning for Khurda-VZM and Duwada-BZA

  14. WAGON INDUCTIONS:TARGET 18000 / YEAR

  15. DPS & LONG HAUL • New wireless technology under procurement: - Distributed power , suited for Long Hauls - Shorter braking distance; more speed - Saves crew & paths STRATEGY FOR XIITH PLAN OPERATIONS NEW COAL SIDINGS TO ACCOMMODATE LONG HAUL:PLAN WIRELESS

  16. PROCESS OF LOADING Pithead Crushing Transporting to siding Loading Supplying Rake Dispatches CIL IR

  17. REDUCING BANDWIDTHLOADING IN THE YEARR

  18. PATH AHEAD • FIRST MILE CONNECTIVITY CRUCIAL: ALL WEATHER ROADS, TRUCKS,ETC • REDUCED BAND WIDTH:LOADING UNIFORMLY THROUGHOUT THE YEAR WITH BAND OF MAX 10RAKES BETWEEN MINIMA AND MAXIMA • At Ports Supplies to be continuous – no spurts • Redundancy in handling infrastructure incl storage space

  19. Thank You