P08027: Winter Quarter Schedule. Week 1: Submit IRB test request. Week 4: Completion of IRB Test GUI. Week 6: Begin IRB testing. MSD 2: Prototype Construction. Winter Quarter. Spring Quarter. 6. 1. 4. MSD 2. P08027: MSD2 Schedule. Week 1: Initial Prototype Construction.
E N D
P08027: Winter Quarter Schedule Week 1: Submit IRB test request Week 4: Completion of IRB Test GUI Week 6: Begin IRB testing MSD 2: Prototype Construction Winter Quarter Spring Quarter 6 1 4 MSD 2
P08027: MSD2 Schedule Week 1: Initial Prototype Construction Week 3: Individual System tests complete Week 4: IRB Study Complete Week 5: Initial System Tests complete, Begin System wide testing Documentation Started. Week 6+: Testing and Refinement Finish Documentation Prototype Construction Testing 5 4
MSD II FLOWCHART P08027: TODD B. Week 1 Construct Electrode Strap and sleeve prototypes. Week 2 Finish construction and begin testing. Week 3 Resume testing of Strap/Sleeve and modify as necessary. Week 4 Resume testing of Strap/Sleeve and modify as necessary. Week 5 Determine which design is better - sleeve or strap Week 6 Build two prototypes of final, customer approved design Week 7 Resume testing of device and modify as necessary. Week 8 Formal Paper/Poster and documentation Week 9 Formal Paper/Poster Week 10 Formal Paper/Poster Week 11 Present project.
MSD II FLOWCHART P08027: VIANNA M. Week 1 Develop Signal Processing for HW Continue IRB Week 2 Continue to develop Program Finish IRB Week 3 Implement signal processing in HW Week 4 Continue program. Test functionality With DSP. Week 5 Test Signal Processing program Week 6 Continue to modify signal processing code Begin formal paper and Poster design. Week 7 Continue testing and Analysis. Continue paper and Poster. Week 8 Finish testing, make Appropriate changes. Begin finalizing paper And poster. Week 9 Final troubleshooting And testing. Finish paper and Poster. Week 10 Double Check tasks Assure everything is Completed and functional Week 11 Prepare and demonstrate final product
MSD II FLOWCHART P08027: PETER D. Week 1 Interface amplifier with DSP board. Continue IRB. Week 2 Begin coding on the DSP. Finish IRB. Week 3 Continue coding on the DSP.. Week 4 Continue coding on the DSP. Begin Testing with controller algorithm Week 5 Integrating filtering with the Control system Week 6 Starting testing with IRB gathered data Week 7 Continue testing with the IRB data Week 8 Formal Paper/Poster Continued testing Week 9 Formal Paper/Poster Continued testing Week 10 Formal Paper/Poster Continued testing Week 11 Product Presentation
MSD II FLOWCHART P08027: JAY R. Week 1 Continue IRB. Begin communication With the DSP Week 2 Finish the IRB. Work on Control algorithm with On the DSP. Week 3 Continue DSP control Algorithm. Week 4 Finish the Control System and begin testing With the filter Week 5 Test Wireless Transmission of data Between DSP and car. Week 6 Test and T/S issues With DSP using Live EMG data Week 7 Test and T/S issues With DSP using Live EMG data Week 8 Test and T/S issues With DSP using Live EMG data. Begin documentation Week 9 T/S, Document Week 10 Document all Implementation on DSP Along with results Week 11 Product Presentation
MSD II FLOWCHART P08027: JAMES C. Week 1 Begin implementation of RC subroutines. Continue IRB Study Week 2 Continue implementing RC subroutines. Finish IRB Study Week 3 Begin implementing wireless subroutine Test RC subroutines Week 4 Continue implementing wireless subroutines Week 5 Test wireless communications Week 6 Help with DSP, begin System wide tests Week 7 Help with DSP Continue T/S and modification Week 8 Continue developing and Testing interface Between DSP and car Week 9 Documentation. Finish development of RC Car controls. Week 10 Document Interfaces Week 11 Final testing and documentation authoring
MSD I FLOWCHART P08027: DANZIGER Week 1 Inventory Parts Continue IRB Testing Week 2 Put together Speaker Test and Troubleshoot (T/S). Finish IRB Study Week 3 Put together test matrix for DSP output Document for next SD phase Week 4 TroubleShoot RC Car, DSP, Speaker Document for next SD phase Week 5 Continue T/S as needed Document for next SD phase Week 6 Continue T/S as needed. Begin full system tests Begin final paper Documentation Week 7 Troubleshoot, Test Continue Final paper Begin Poster Documentation Week 8 Document System Continue T/S, final paper, Poster design Documentation Week 9 Trouble Shoot System Finish paper Finish poster design Week 10 Present Completely Working System Finish all SD doc. for Next phase Week 11 Present the system Ensure all aspects are complete.