REVIEW ON MGNREGS IMPLEMENTATION SEPTEMBER, 2010

REVIEW ON MGNREGS IMPLEMENTATION SEPTEMBER, 2010. DISTRICT ‘MGNREGS’ CELL PURBA MEDINIPUR. BLOCKWISE RANKING ON BALANCE IN HAND AS PER MPR SEPTEMBER, 2010. BLOCKWISE RANKING ON BALANCE IN HAND AS PER MPR SEPTEMBER, 2010.

hinda
Télécharger la présentation

REVIEW ON MGNREGS IMPLEMENTATION SEPTEMBER, 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. REVIEW ON MGNREGS IMPLEMENTATION SEPTEMBER, 2010 DISTRICT ‘MGNREGS’ CELL PURBA MEDINIPUR

  2. BLOCKWISE RANKING ON BALANCE IN HAND AS PER MPR SEPTEMBER, 2010

  3. BLOCKWISE RANKING ON BALANCE IN HAND AS PER MPR SEPTEMBER, 2010

  4. Water conservation and water harvesting (number of & cubic mts as well) (digging of new tanks/ponds percolation tanks, small check dams etc to be indicated separately)

  5. Drought proofing (in nos. & hectare as well) (afforestation and tree plantation and other ectivities to be indicated

  6. Micro irrigation works (in nos. & length in km) (minor irrigation canals and other activities to be indicated separately)

  7. Provision of irrigation facility to land owned by : (in nos.) (scheduled castes and scheduled tribes, beneficiaries of land reforms and beneficiaries of IndraAwasYojanaect. To be indicated separately) • Unit of this sector is Hectre.

  8. Renovation of traditional water bodies (in nos. & cubic. Mt as well) (desilting of tanks/ ponds, desiliting of old canals, desiliting of traditional open well etc. to be indicated separately)

  9. Land development (in nos. & hecter as well) (plantation, land levelling other activities to be indicated separately)

  10. Flood control and protection (in nos. & length in Km) (drainage in water logged areas, construction and repair of embankment to be indicated separately)

  11. Rural connectivity (in nos. & length in Kms.)

  12. Any other activity (approved by MoRD)

  13. Tasks Ahead • Scrutiny of MPR before mailing to DPC. • Prepare Labour Budget for 2011-12 within 133% of approved amount of this year (mailed on 05.10.2010). • Direct the G.P.s to start preparation of annual action plan for 2011-12 u/s 12(3) of the WBREGS, 2006. • Social Audit not yet uploaded by all blocks. • We could not achieve 100% inspection from block level.