html5-img
1 / 16

CNP DIMP Strategy Overview

CNP DIMP Strategy Overview. Mark Clayton Manager System Integrity and Reliability 713-207-4885 mark.clayton@centerpointenergy.com. What will our DIMP program be like?. Brevity will be the soul of our DIMP Lessons learned from TIMP It is risk prioritized and performance based

hoang
Télécharger la présentation

CNP DIMP Strategy Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CNP DIMP Strategy Overview Mark Clayton Manager System Integrity and Reliability 713-207-4885 mark.clayton@centerpointenergy.com

  2. What will our DIMP program be like? • Brevity will be the soul of our DIMP • Lessons learned from TIMP • It is risk prioritized and performance based • Performance is evaluated over 5 year periods • Performance will be reported at the State and Federal Level • Performance Improvement Initiatives will be developed through a systematic search of the root causes effecting performance and resulting plans will directly focus on those root issues • DIMP Compliance will be coincidental to our Asset Management programs • It addresses each requirement of the regulations

  3. Know your systems • Facility Records – Installation WO’s, Leak Repairs, Maintenance Records, and others. • Operations and Engineering SME’s • Well Trained Knowledgeable Field Employees • On going WO’s for Maintenance and Leak Repair – SAP • Data from Third Parties – Population Density, Soils, etc.

  4. Know Your System • GIS – ESRI – ARC-FM • Historical Data Repository • 2. Optimain by Opvantek (Gap) • User friendly window into data history • Data Analysis • Relative Risk Calculation

  5. Evaluate System Threats • Data Analysis – GIS & SAP • Engineering and Operations SMEs • Outside sources of information – Vendors, Regulators, Industry Associations

  6. SME Threat Review • Review 8 Major Threats Indentified by PHMSA • Identify any possible threats (root causes) • Review the threats specific to your areas (Gap) • Differentiate between significant threats and the rest • Threats that represent the larger percentage of failures • Evaluate quality of data set needed for analysis • Demonstrate threat mitigation through existing process and/or procedures. (performance measure gap) • Document any best practices/additional action outside of the existing manual done to mitigate thr

  7. Evaluate System Threats • Excavation Damage • Corrosion • Material Failures • Incorrect Operations – Construction defect, PTP • Natural Forces

  8. System Threat Areas(Examples) • Lack of Facility Record system • Cast Iron System • Bare Steel System • Leaking Mechanically Coupled Systems

  9. Analysis of Relative Risk • We look at relative risk groups with higher risk relative risk getting priority attention • Avoid getting bogged down in the individual risk scores

  10. Overall Purpose • What do the numbers represent? • A measure of the state operation’s current performance • Only relevant within a particular state • Not meant for comparison between Regions or to National data due to the diversity in operating conditions • An opportunity to identify areas of concern • Possible gaps in data

  11. Evaluate Performance • Define how you measure performance in your DIMP - Statistical Analysis (line/curve fitting) - Establish Reasonable Range of Data - Standard Deviations from trends

  12. Division 1 Main Leak Repair Trends

  13. Division 1 Service Leak Repair Trends

  14. Establish action plans • Excavation damage – improve program? • Leverage Data to establish alternative maintenance inspection intervals instead of prescriptive rules (Gap – Texas RBLSS) • Changes to plans, policies, procedures, materials, equipment must be documented and shown to hold the line or reduce risk in your system (MOC) • Evaluate plan performance against threats (Gap – Statistical Capability & documented procedure)

  15. Report to Regulators • Enhanced Annual Distribution System Reports for required data • PHMSA • State Reporting Requirements • Texas PS-95

  16. Related Strategic DIMP Issues • Continue to enhance relationship with State Regulators with regular targeted communication and listening. • Investments to enhance field data gathering skills and systems for; flexibility of data content, clarity, consistency, and value. • Employee Training

More Related