Phase I Preliminary Plans Pedestrian Walkway Planning Subcommittee (PWP)

Phase I Preliminary Plans Pedestrian Walkway Planning Subcommittee (PWP). Stow Planning Board Meeting October 19, 2010. Big picture – Walkway Planning in 2 phases. Phase I - Connect existing walkways along 117 Corridor Short-term

hoang
Télécharger la présentation

Phase I Preliminary Plans Pedestrian Walkway Planning Subcommittee (PWP)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Phase I Preliminary PlansPedestrian Walkway Planning Subcommittee (PWP) Stow Planning Board Meeting October 19, 2010

  2. Big picture – Walkway Planning in 2 phases • Phase I - Connect existing walkways along 117 Corridor • Short-term • Plan, design, and construct a few sections of walkway along the 117 corridor • Phase II - Prioritize other walkway and maintenance projects • Longer-term • Create a list of recommended projects • Plan for construction including design, maintenance, and funding.

  3. Phase I Status • Phase I moving along as planned • Upper Common has been taken out off the table for Phase I construction • Community Survey Results • 85% supportive of increased walkability • Phase I Land Survey Results • No major obstacles to construction • A little extra expense in a few places

  4. Status Update (con’t) • Open considerations • Snow removal • Recent MA Supreme Court Ruling • Need clarification on Stow’s official position/intent • Crosswalk locations • Town Hall / Town Building • Rt. 62 / 117 Intersection • Harvard Rd. • Hudson Rd • Parking • Concur with Safety Officer recommendations • Provides safe pedestrian access to overflow parking

  5. Thank you.

  6. EXTRAS

  7. Phase I - Planning • Proposed location of planned walkways: • Public inventory on Google maps http://maps.google.com/ • Research and document feasibility (e.g. physical, legal) • Sample of planned walkway designs from Acton/Sudbury Walkway Plans, MAPC • Communication with town and key groups: • Agreement to proceed from Planning Board and Selectmen • Open meetings: • Benefits and barriers for proposed walkways • Hearings as necessary

  8. Phase I - Implementation • Walkway Design: • Acquire design services either through professional contract or as a student project • Walkway Construction: • Contract construction services through a standard bidding process • Walkway Funding: • Design: existing walkway fund (~$249k)