Proposal for Space Optimization and Equipment Installation in 361
This proposal outlines the removal and installation of various equipment in space 361 to optimize operations for H- service. Key activities include the removal of obsolete SMH and SMV units, the installation of new SMV and BI BS chicane systems, and integration of 16 power converters for powering strip foil chicanes. The plan aims to establish the necessary space for 57 EPC racks, crucial for efficient operation. Further study is required to finalize the layout for enhanced functionality and power management.
Proposal for Space Optimization and Equipment Installation in 361
E N D
Presentation Transcript
Space in 361 • The following is proposed in 361-1-012 • Remove SMH and SMV[1,2,4] • Install new SMV[1,2,4] • Remove DIS PB[1,2,3] (4x3 racks) • Install BI[1,2,3,4].BS Chicane (~5x3 racks) • Alternative • Install BI[1,2,3,4].BS Chicane (~5x3 racks) • Install PSB Qstrip Trims (2x5 racks) Obsolete (see next slides) Space for PSB BI powering
Power converters for strip foil chicane • 16 Power converters integration
Space in 361 • The following proposal in 361-1-012 needs further study, but identifies space for 57 EPC racks required for H- operation • From LS1 -> H- operation • Install new SMV[1,2,4] (megadiscap)(x4 non-standard racks) • Remove DIS PB[1,2,3] (4x3 racks) • For H- operation • Remove old SMH and SMV[1,2,4] • Install BI[1,2,3,4].BSW1 (~5x3 racks) • Install BI[1,2,3,4].BSW[2,3,4] (~14x2 racks) • Install PSB Qstrip Trims (2x5 racks) Space for PSB BI powering