1 / 10

LUCOEX PPM 5

LUCOEX PPM 5. W1/W6 – Progress and plans Äspö HRL 2014-05-13. WP1 - Progress and plans 1(2). Delivery plan 36 month report delivered Amendments to contract with EC Project extension Change of scope for WP4 – Exclusion of Dismantling Change of scope for WP4 – Inclusion of Core drilling

ina
Télécharger la présentation

LUCOEX PPM 5

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LUCOEXPPM 5 W1/W6 – Progress and plansÄspö HRL 2014-05-13

  2. WP1 - Progress and plans 1(2) • Delivery plan • 36 month report delivered • Amendments to contract with EC • Project extension • Change of scope for WP4 – Exclusion of Dismantling • Change of scope for WP4 – Inclusion of Core drilling • Change of devision of budget for WP5 • Depending on approval from EC • Update of time table (delivery plan)

  3. WP6 - Progress and plans 1(2) • End conference • March/April 2015 • Hosted by Posiva • Visit test facility • Announcement latest at Manchester conference (June) • Newsletter • Scientific article • Characteristics of “other” concepts compiled and communicated with respective country • Scholarships

  4. WP6 - Progress and plans 2(2) • Manchester Conference (June) • LUCOEX will produce two oral presentation • “Clay” – repositories • “Crystalline” - repositories • LUCOEX-project will produce 5 different posters (size A0): • LUCOEX and evaluation of how the results can be utilized by less advanced programs (ongoing master thesis) • State-of-art: Horizontal disposal in crystalline rock • State-of-art: Vertical disposal in crystalline rock • State-of-art: Horizontal disposal of waste packages in Opalinus Clay formation • State-of-art: Horizontal disposal of waste packages in Callovo-Oxfordian clay formation

  5. SCM - agenda

  6. SCM - agenda Amendments End conference Update of milestones and delivery plan Report comparisonisostatic and uniaxial pressed block Others LucoeX meeting at Äspö HRL

  7. Amendments • Submitted letter to EC • Response from EC • Prepare answer Jan, Thanks for the material. My comments in the letter and in the justifications doc for extension. This point is the most important one and the project must make a convincing case that an extension will have been unavoidable. Do not send the request before we have finalised the documents. For the letter, I will submit the draft after our exchanges to the EC contract unit for any comment. Regards, Christophe

  8. End conference Goal General program Duration Letter to Posiva Practical aspects Together with Dopas Part of expert group could review programme SKB - Nagra meeting at Äspö HRL

  9. End Conference - topics • Results from WP´s • Workers safe • (Machine development process) • Human factors engineering • Instrumentation • QA/QC buffer blocks and pellets production • Demonstration • Visit test hall (if in Finland) • Movie showing installation WP5 • (Movie showing installation from WP2, WP3, WP4)

  10. Milestones and deliveries • Update milestones and delivery plan • Best estimate from each WP-manager

More Related