1 / 28

SksMinus status

SksMinus status. SKS meeting 2008/1/18 白鳥昂太郎. SksMinus setup. SksMinus. SDC1~4 : Beam position measurement. STOF : Time-of-flight SAC & BAC: K - beam veto and p - ID (n=1.03). Background Veto. _. SMF : m - from K - → m - + n SP0 : p - from K - → p - + p 0.

iolani
Télécharger la présentation

SksMinus status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SksMinusstatus SKS meeting 2008/1/18 白鳥昂太郎

  2. SksMinus setup SksMinus • SDC1~4 : Beam position measurement • STOF : Time-of-flight • SAC & BAC: K- beam veto and p- ID (n=1.03) Background Veto _ • SMF : m- from K- → m- + n • SP0 : p- from K- → p- + p0 Target ~20 g/cm2

  3. SksMinus elements Test and production in progress • Drift chambers : BD(SDC3,4), SDC1,2 • Timing counters : STOF, BH2 • Beam decay veto counters : SMF Design • Aerogel Cherenkov counters : BAC, SAC • Beam decay veto counters : SP0 • Targets : 4He target

  4. In progress

  5. Drift chambers BD (SDC3&4) SDC1&2

  6. BD repair status All sense wire exchange : 20 mm → 25 mm • Freiberg (XX,UU,VV) • 3 layers finished (X,U,V) • The other 3 layers : repair in Jun → Test in Feb • BNL (XXXX,UU,VVV → XX,UU,VV) • Feb ~ Apr : repair • Apr ~ May : test Repair routine is fixed.

  7. BD status • Plateau : 1950~2250 V → 2150 V operation • Uniform wire tension

  8. BD test • Efficiency and resolution test by cosmic ray • FUJI beam line ? • DAQ with TKO MHTDC • Test and study how to use TKO MHTDC • 3377 by CAMAC is easy… Goal : Less than 400 mm (rms) resolution (~300 mm is possible) *Where do we test ? ⇒ East counter hall ?

  9. SDC1 and 2 • SDC1 : SksPlus SDC2 (400×200 mm2, 3mm spacing, xxuuvv planes) • After Okamura’s chamber ? • SDC2 : Old SDC2 (560×150 mm2, 5 mm spacing, xxuu planes) • Test and repair from Jun (or after ?)

  10. Frame and readout electronics • Frame (Upstream and Down stream) • Not yet designed : SKS configuration, common frames ? • Plan of production : From Jun • Readout electronics • Fryeburg : Special preamp with modification • BNL : Present readout with modification • SDC1 and SDC2 : Present readout ⇒ TKO TDC

  11. 3 4 8 11 12 1 2 5 6 7 9 10 Schedule Freiberg repair test BNL repair test SDC2 repair test SDC1 ????? Frame Design Production Readout (cable, connector) Design Production and test

  12. STOF, SMF, BH2

  13. STOF • BT cannot be used…. • Dt ~100 ps(rms), 30 cm attenuation length • Present SKS TOF counter • Dt ~80 ps(rms), 100 cm attenuation length ⇒To add Present SKS counters • Present 15 segments ⇒ STOF 30 segments • + 15 segments Frame design and production : From now • The similar design with present SKS TOF frame BH2 and BP : Just production

  14. SMF (K→m n veto) SMF Timing counter • FTOF(KURAMA) + BT • BT×14 segments Iron block • Iron beam shield • Frame design is not difficult. BT test⇒ Usable. FTOF Iron block BT

  15. BH2 & BP • BH2 : Start counter (time zero) • 1 segment with booster PMT • BP : Beam decision counter • 1 segment : Fiber readout ? BAC1 BAC2 SAC Beam BH2 Target BP

  16. Design SP0 SAC, BAC Target

  17. SP0

  18. SP0 (K→p p0 veto) Beam decay background veto Performance • 80% of p events rejected (enough) Accidental hits from background • Multi-layer hit, total energy deposit • OK : Neutron, low energy gamma, mesonic-decay • Other charged particles ⇒ Charge veto • NO : Mesonic-decay : p0 (~20% kill @ 4LHe) SP0 : p- from K- → p- + p0

  19. 3 4 8 11 12 1 2 5 6 7 9 10 SP0 design • Range counter (E559) based • Scinti、PMT: OK + (Iron shield) • Light guide or Fiber ? • Lead : How to get (600 kg) • Frame : How to fix lead ? design easy test ? production Range counter disassembly

  20. AC counters SAC, BAC

  21. AC design Index : n=1.03 ~4 photons • BAC1,2 • 160×30×75 mm • SAC1 : • 300×90×75 mm • SAC2 : • 360×100×75 mm With 2 inch fine mesh PMT (F~72 mm)×8 Inside : White box, w/ or w/o reflector Design and test start from Mar

  22. 3 4 8 11 12 1 2 5 6 7 9 10 AC test and schedule • To test largest size (SAC2: 360×100×75 mm) • Cosmic ray test • Efficiency by LNS beam • Inside w/ or w/o reflector • Other In-beam test ? test test test test design production improvement improvement improvement

  23. 4He target Target size : f150 mm×250 mm • No progress • Just start to design (E549, E570 target)

  24. Summary • Three important elements • BD in progress : 1 detector finished in February. • SP0 design will be finished soon. • He target is just designed stage. • Other elements • Timing counters are production stage. : STOF, SMF, BH2, BP • AC counters (BAC and SAC) are designed stage.

  25. Others

  26. SKS移動 : Pivot 支持装置を設置 支持装置(L字) 設置前 設置後 回転中心 ピボット。ここに回転中心用ジグを設置 To produce SksMinus支持装置(L字)

  27. SKS移動 : 油圧ジャッキ, 腕 油圧ジャッキ用の腕 設置前 設置後 腕 油圧ジャッキ 押すときには上下に動かないように固定するジグが必要。SKSの壁に付ける。

  28. Readout channels • DC : total 2608 ch (T) • SDC1 (xxuuvv) : 128 ch×6 = 768 ch • SDC2 (xxuu) : 112 ch×4 = 448 ch • SDC3 (xxuuvv) : 108 ch×2 + 120 ch×4 = 696 ch • SDC4 (xxuuvv) : 108 ch×2 + 120 ch×4 = 696 ch • Timing counter : total 64 ch (A&T) • STOF : 30 segment : 60 A&T • BH2, BP : 2 ch×2 = 4 A&T • Veto counter : total 88 ch (A&T) • SMF : 24 + 14 segments : 38 A&T • SP0 : 5 segments×10 layers : 50 A&T • AC : total 8 ch (A&T) • SAC : 2 ch×2 = 4 A&T • BAC : 2 ch×2 = 4 A&T TKO TDC 32 ch TDC×82 TKO ADC 16 ch ADC×10 HR TDC 16 ch TDC×10

More Related