An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FLOOD MITIGATIONOBSERVATIONS AND LESSONS FROM A FLOOD IN THE SMITH FIELDHOUSE BRIGHAM YOUNG UNIVERSITY AUGUST 2006

  2. I want to talk to you about what I think are five key elements of flood mitigation. • Notification • Response/Mobilization • Clean up • Restoration/Reconstruction • Evaluation

  3. 1. NotificationWho and how fast • - Electronic Alarm notification to University Police • -University Police assessment • -Police notify appropriate on call person and Risk Management • -On call specialists can handle their areas well but you need a good mechanism to alert upper level management in major events

  4. Notification Strengths • -Risk management informed early • -Risk management informed upper level management early • -Good cell phone communication

  5. Notification Weaknesses • -College notification • -Cell phone batteries • -Notification process took too long

  6. 2.Response/ MobilizationIncident command • -Select an incident command person who can delegate responsibilities and stay put. • Don’t assign a “hands on” person this responsibility. Glen Johns our Risk Management and safety director was on call and served as incident commander. • Have the incident command decision made now before the incident occurs.

  7. 2. Response/MobilizationInitial safety assessment • -Glen Johns and safety office staff • -Electrocution hazard assessed and mitigated

  8. 2. Response/MobilizationReporting • Make sure you have a good mechanism for your own line reporting. “Keep your boss informed.” • Incident command only reports through their line

  9. Response/Mobilization strengths • -Handled quickly • -Had good incident commander available

  10. Response/Mobilization weaknesses • -Some cleanup was occurring before safety assessment was complete • Some of my own line reporting was slow.

  11. 3. CleanupDelegate assignments • -In our case Glen Johns our Risk Management director delegated • -Buildings/Water clean up • -Electrical/ Utilities service • -Food • -Media relations • -Campus academic communication

  12. 3. CleanupPumping problems/ Capacity, Lift, Reach • -Electric and mechanical service could not be addressed until water was cleared out. • -With water flooding basement areas and filling mechanical rooms water pumping became a major issue.

  13. 3. CleanupPumping problems/ Capacity, Lift, Reach • Gas powered pumps with limited lift presented two problems. • Pumps had good volume capacity but limited lift and limited hose reach • If pumps were placed in buildings near water sources carbon monoxide became a problem. • -We had four large 2 and 3 inch discharge pumps in place and made no headway.

  14. 3. CleanupPumping problems/ Capacity, Lift, Reach • -We called in Provo City and they supplied a 6 inch diesel powered pump. With our grounds division diesel powered sewer truck and Provo City’s pump we began to make headway

  15. 3. CleanupWater shutoff problems • -Water break was in a loop fed from 2 directions identifying and turning off water was a process that took too long. • -One of the shut off valves was allowed to be placed in the flooded basement mechanical room. • -Other remote field water line valves were hard to locate • -Break was in a water loop so it had to be shut off from two directions

  16. 3. CleanupUtilities • -The major mechanical rooms and electrical rooms were under 10 feet of water

  17. 3. CleanupUtilities • -Switchgear and transformers were damaged beyond repair and had to be replaced. • -Parts were 3 to 5 days out

  18. 3. CleanupUtilities • -Emergency power switchgear was inoperable

  19. 3. CleanupDrying out • -A large wood playing floor had some water underneath it and needed heavy air flow to save it • -Power availability to run drying fans became a problem • -We had to evaluate our resource for drying out after the water was stopped and pumped out. • We did not have de-humidifiers

  20. 3. CleanupContract help

  21. 3. CleanupContract help • -Don’t be a hero call in available help. We used “Utah Disaster Cleanup”. Their resource for fans and the power to run them was great. • -We have a lot of equipment here on campus. All totaled we have around 100 floor fans for use around campus. That sounds good but a big clean up contractor will have the following; 1000 floor fans Generators and extension cords to run all of them 25 Air dryers • Additional manpower with the ability to work around the clock. • Make sure you have a single contract source for work performed • Specialized equipment for computer repair and file retrieval. • Well worth the expenditure

  22. 3. CleanupStrengths • Good delegation • Teamwork • Incident command handled other problems that allowed non distracted cleanup

  23. CleanupWeaknesses • Failure to establish good contact point with contract help • Contract help not communicating contact information at shift change

  24. 4. Restoration/ReconstructionMold • -Keep air moving until crawl spaces are completely dry. • -Remove water traps where air can’t circulate. • -Remove soaked gypsum board.

  25. 4. Restoration/ReconstructionMold • -Wall covering will shrink and cannot be re-glued • -Carpet extract or remove. • -Measure moisture content do not assume

  26. 4. Restoration/ReconstructionOdor • -Eliminate don’t mask • -We are still circulating air in some dirt floor crawl space areas.

  27. 4. Restoration/ReconstructionFurniture and electronic equipment • -Replace soaked upholstered furniture • -Computers were sent to contract water damage company and saved about 75%

  28. 4. Restoration/ReconstructionNew Construction • -Complete demolition, haul off and dry out to protect from mold spores

  29. 4. Restoration/ReconstructionStrengths • Had in house labor available for immediate response • Did not have a long delay for plans and specifications

  30. 4. Restoration/ReconstructionWeaknesses • Still some odor in dirt floor crawl spaces • Some carpet has gone bad long after flood. We should have replaced

  31. 5. EvaluationPost incident meeting • Large or small discuss your process with all involved • Include occupants, managers, risk management, front line workers in your assessment • Do it with in 60 days of incident

  32. 5. EvaluationPost incident meeting • Evaluate the cause

  33. 5. EvaluationPost incident meeting • Evaluate future problems