This project explores the application of advanced manufacturing techniques for the fabrication and automated assembly of high-density power converters. Led by Dr. Xi Lin from the PEMC Research Group at the University of Nottingham, the study aims to identify current manufacturing practices, limitations, and bottlenecks impacting yield, reliability, and cost. The initiative will evaluate opportunities for increased automation and investigate methods to integrate electrical, mechanical, and thermal components. Expected outcomes include comprehensive reports and hardware demonstrations showcasing automated manufacturing techniques.

jackie
Télécharger la présentation

Structural and Functional Integration for Power Converters

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Structural and Functional Integration for Power Converters To investigate the application of advanced manufacturing techniques to the fabrication and automated assembly of highly integrated power converters. Dr Xi Lin PEMC Research Group, University of Nottingham xi.lin@nottingham.ac.uk With support from MTC Technology Maturation Officer (TBC) and industrial partners (TBC) Potential collaboration with Additive Manufacturing Group at Nottingham and Welding Group at Manchester

  2. Project Plans & Objectives To understand current practice of the manufacture of power conversion equipment, associated limitations and bottle necks which affect yield, reliability and cost. To evaluate opportunities for improvements in manufacture, with a view to increased automation and to demonstrate one of the identified techniques. To investigate advanced manufacturing techniques which will aid the manufacture of miniaturised, high density power converter through integration of electrical, mechanical and thermal components during manufacturing.

  3. Potential Outcomes & Exploitation Plans Report/publication detailing current manufacturing practice and its limitations. Report/publication detailing opportunities for automated manufacture of power converters using detailed case studies. Hardware demonstration of most promising techniques for automated manufacture. Report/publication detailing capabilities and strategies for manufacturing ultra-integrated compact power converters. Hardware demonstration of most promising techniques for manufacture of ultra-compact converters.