Sviluppo dell’infrastruttura stradale in Romania 2013

Sviluppo dell’infrastruttura stradale in Romania 2013. Bibliografia: Ministerul Transporturilor si Infrastructurii, Compania Nationala de Autostrazi si Drumuri Nationale Dezvoltarea infrastructurii rutiere in Romania. 2. Summary

jaegar
Télécharger la présentation

Sviluppo dell’infrastruttura stradale in Romania 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sviluppo dell’infrastruttura stradale in Romania2013 Bibliografia: Ministerul Transporturilor si Infrastructurii, Compania Nationala de Autostrazi si Drumuri NationaleDezvoltarea infrastructurii rutiere in Romania

  2. 2 Summary Quali sono gli obiettivi generali per l’infrastruttura stradale? Qual’e’ lo stadio attuale della rete? 2 ROADS

  3. Obiettivi generali di CNADNR • Ammodernamento e riabilitazione delle strade statali e dei ponti • Costruzione di tangenziali per le citta’ con alto volume di traffico • Costruzione di nuove autostrade e tangenziali a profilo di autostrada • Riprogettazione e ridimensionamento della struttura stradale della rete esistente di strade statali per un carico per asse di 11,5 ton • Rispetto delle norme di tutela dell’ambiente e l’integrazione con le norme europee • Rafforzamento della capacita’ amministrativa nel campo dell’infrastruttura stradale

  4. Quadro legislativo – Legge no 363/ 2006- quadro di riferimento per futuri progetti nel campo dell’infrastruttura stradale

  5. Rete di strade pubbliche Lunghezza = 79.038 km (esclusivamente rete stradale) classificate come segue: 1. Strade nazionali 16.824 km Di cui: autostrade 505 km 2. Strade provinciali 34.914 km 3. Strade comunali 27.300 km La rete di strade nazionali e’ amministrata dalla Compania Nazionale di Autostrade e Strade Nazionali di Romania, societa’ funzionante sotto il Ministero dei Trasporti e Infrastruttura. La rete di trasport odella Romania e’ strutturata come segue: autostrade 505 km strade nazionali europee 5.938 km strade nazionali principali 4.383 km Strade nazionali secondarie 5.998 km

  6. IL PROGRAMMA DI COSTRUZIONE DELLA RETE DI AUTOSTRADE

  7. Corridoi Pan – Europei di Trasporto Corridoio IV L=3.258 km BERLIN DRESDA NUREMBERG PRAGA BRNO VIENA BRATISLAVA GYOR BUDAPESTA ARAD CRAIOVA BUCURESTI CONSTANTA SOFIA PLOVDIV SALONIC ORMENIO ISTAMBUL Corridoio IX L=6.500 km HELSHINKI ST. PETERSBURG MOSCOVA KALINGRAD KIEV ODESA CHISINAU BUCURESTI VILNIUS KRAIPEDO MINSK ALEXAN-DROPOLIS DIMITROGRAV ORMENIO Romania e’ situata nella parte SE dell’Europe ed e’ attraversata da 2 corridoi pan – europei: IV si IX

  8. Corridoi Pan – Europei di Trasporto ALBITA NADLAC CorridoioPan – Europeo no IV • NADLAC – TIMISOARA – LUGOJ – BUCURESTI – CERNAVODA - CONSTANTA LUGOJ Corridoio Pan – Europeo no IX GIURGIU – BUCURESTI - ALBITA Serbia Corridoio Pan – Europeo no IV – ramo sudico • LUGOJ – CRAIOVA - CALAFAT CRAIOVA BUCURESTI CONSTANTA CALAFAT GIURGIU

  9. Rete autostradale AUTOSTRADA TRANSILVANIA BRASOV - BORS AUTOSTRADA TG. MURES – IASI – UNGHENI UNGHENI Suplacu de Barcau BORS ALBITA GILAU AUTOSTRADA PLOIESTI – COMARNIC - BRASOV TARGU MURES NADLAC BRASOV LUGOJ CORRIDOIOPAN-EUROPEO NO IX PLOIESTI CORRIDOIO PAN - EUROPEO NO IV CONSTANTA CRAIOVA BUCURESTI CALAFAT VAMA VECHE

  10. TOTALE – 2.302 km di autostrada, Di cui:

  11. STATO ATTUALE DEI PROGETTI DI INFRASTRUTTURA STRADALE IMPLEMENTATI: 1. CON FINANZIAMENTO ASSICURATO – IFI 2. PROPOSTE PER ESSERE REALIZZATE IN CONCESSIONE 3. CON FINANZIAMENTO ASSICURATO – FONDI EUROPEI E GOVERNO 4. CON FINANZIAMENTO ASSICURATO – BUDGET DI STATO

  12. Autostrade e tangenziali con profilo di autostrada – in funzione, con finanziamento BEI/ BERD Tangenziale di Arad (12,25 km) 2009-2011 Arad – Timisoara (32,25 km) 2009-2011 Tangenziale di Constanta (22,1 km) 2008-2011 Cernavoda – Constanta (51,31 km) 2009-2011 Lunghezza: 118 km

  13. Autostrade e tangenziali con profilo di autostrada – in esecuzione e gara, con finanziamento:Unione Europea e Budget di Stato Nadlac – Arad (38,88 km) Timisoara-Lugoj (35,125 km) Orastie-Sibiu si by-pass Sebes (82,07 km) • Con finanziamento dell’Unione Europea per l’esecuzione dei lavori Lugoj-Deva (99,28 km) Deva-Orastie ( 32,50 km) Lunghezza: 288 km

  14. Autostrade – finanziamento Budget di Stato BRASOV – BORS Sezione Suplacu de Barcau – Bors (64 km) BRASOV – BORS Sezione Campia Turzii – Gilau (51,8 km) Suplacu de Barcau BRASOV – BORS Sectiunea Gilau-Mihaiesti (8,70km) GILAU BUCURESTI – PLOIESTI Sezione Bucuresti – Moara Vlasiei – 13 km in funzione In esecuzione – 6,5 km BUCURESTI – PLOIESTI Sezione Moara Vlasiei – Ploiesti (42,5 km)- in funzione SERBIA TOTALE: 186,5 km

  15. Autostrade e tangenziali con profilo di autostrada – comprese nel programma di PPP/ Concessione per il finanziamento dell’esecuzione Tg Mures-Iasi-Ungheni Lunghezza: 311,66km Comarnic - Brasov Lunghezza: 55 km Sibiu – Pitesti Lunghezza: 116,64 km Focsani-Albita Lunghezza: 155 km Ploiesti-Buzau-Focsani Lunghezza: 133,00 km By-pass Bucuresti Nord Lunghezza: 53 km Ploiesti-Comarnic Lunghezza: 48 km By-pass Bucuresti Sud Lunghezza: 48 km Lunghezza: 920 km

  16. Programma costruzione autostrade LEGGENDA Sezione in funzione: In esecuzione Ungheni In gara - 2012 Bors Progetti futuri Tg. Mures Albita Nadlac Arad Deva Sibiu Brasov Timisoara Orastie Lugoj Ploiesti Pitesti Constanta Bucuresti Bucuresti Cernavoda Craiova Calafat Constanta

  17. PROGRAMMA COSTRUZIONE SUPERSTRADE SUPERSTRADA PETEA – SATU MARE – BAIA MARE SUPERSTRADA ZALAU – BAIA MARE SUPERSTRADA BRAILA - GALATI SUPERSTRADA SIBIU - FAGARAS SUPERSTRADA ARAD - ORADEA SUPERSTRADA SEBES - TURDA SUPERSTRADA CRAIOVA - PITESTI SERBIA Lunghezza: 516 km 19

  18. Riabilitazione strade nazionali Obiettivi finalizzati

  19. Riabilitazione strade nazionali - Lavori consegnati Fase I Lunghezza:1031 km Valore: 334,31 Mil. Euro Finanz.:BIRD, BERD, BEI 19 Fase II Lunghezza: 782,09 km Valore: 436,46 mil. Euro Finanz.: BIRD, BEI, Budget, PHARE, BERD 19A 17 24 1F 17 28 17 Fase III Lunghezza: 659,96 km Valore: 450,80 Mil. Euro Finanz.: PHARE, BEI, ISPA, Budget, JBIC 1 1C 15 1F 12 Fase IV - consegnato Lunghezza: 677,24 km Valore: 596,48 Mil. Euro Finanz.: PHARE, ISPA BEI, JBIC 15 13 2 1 6 7 13 69 24 7 12 Fase V - consegnato Lunghezza: 310,25 km Valore: 208,61 mil. Euro Finanz.: BEI, PHARE, ISPA, Budget 1 6 2 59 6 1 66 7 Fase VI - consegnato Lunghezza: 297,496 km Valore: 258,63 mil. Euro Finanz.: BEI 2 6 7 71 Serbia 1 6 7 2 65 21 6 22C 3 TOTALE KM Strade nazionali riabilitate 3.758 km 56A 5 6 3

  20. RIABILITAZIONE STRADE NAZIONALI PROGETTI DI RIABILITAZIONE PRIMARIA Strade Nazionali Tangenziali Lunghezza: 4.005 km SERBIA

  21. Riabilitazione delle strade nazionali Obiettivi in esecuzione

  22. Riabilitazione strade nazionali Obiettivi in esecuzione, con finanziamento rimborsabile, non-rimborsabile e Budget di Stato TOTALE GENERALE 2.329 KM Lunghezza – 1.001 km Riabilitazione DN con finanziamento rimborsabile SERBIA Lunghezza – 984 km Riabilitazione DN/ riparazioni capitale con finanziamento budget di stato Lunghezza – 344 km Riabilitazione DN con finanziamento non-rimborsabile

  23. AMMODERNAMENTO STRADE NAZIONALI – CON FINANZIAMENTO BEI – LAVORI IN ESECUZIONE DN 18, Baia Mare – Sighetu Marmatiei Lunghezza: 58,7 km Valore: 226,18 mil. lei Costruttore: Aktor SA Fase fisica: 6,30% DN 1H, Zalau –Rastoci Lunghezza: 53,38 km Valore: 172,316 mil. lei Contruttore: PA&CO/ Kemna Bau Andrae GmbH Fase fisica: 43,40% DN 18, Sighetu Marmatiei - Moisei Lunghezza: 69,3 km Valore: 169,19 mil. lei Costruttore: Spedition UMB Fase fisica: 0% DN19/1C, Satu Mare -Baia Mare Livada - Halmeu Lunghezza: 76,62 km Valore: 185,96 mil. lei Costruttore: V&V JV Fase fisica: 53,18% DN 76, Stei - Beius Km 102+660 – 133+660 Lunghezza: 31 km Valore: 99,59 mil. lei Costruttore: Associazione Azvi – Azcale DN 76 JV Fase fisica: 0% DN 24, Crasna –Iasi Lunghezza: 77,45 km Valore: 242,01 mil. lei Costruttore: UMB Spedition / Tehnostrade Fase: 1,89% DN 18, Moisei – Iacobeni Lunghezza: 88,46 km Valore: 421,67 mil. lei Costruttore: Saphir Struct. Fase fisica: 2,70% DN 1C, Dej- Baia Mare Lunghezza: 86,49 km Valore: 296,038 mil. lei Costruttore: FCC Construction Fase fisica: 70,7% DN 15A, Reghin – Saratel DN 15, Reghin -Tg. Mures Lunghezza: 71,5 km Valore: 202,06 mil. lei Costruttore: Strabag Fase fisica: 26% DN 79, Arad – Oradea Lunghezza: 103,545 km Valore: 330,79 mil. lei Costruttore: Astaldi S.p.A. Fase fisica: 91,7% DN 76, Varfurile - Stei Km 69+350 – 102+660 Lunghezza: 33,31 km Valore: 211,87 mil. Lei Costruttore: SC Construct Mod SRL Fase fisica: 11,54% DN 14, Sibiu – Medias – Sighisoara Lunghezza: 79,5 km Valore: 201,943 mil. lei Costruttore: Strabag Fase fisica: 33% TOTALE GENERALE Riabilitazione strade nazionali Con finanziamento rimborsabile 1.001 KM DN 66, Bumbesti Jiu - Petrosani Km 93+500 – 131+000 Lunghezza: 32,50 km Valore: 185,64 mil. lei Costruttore: Copisa Construct. Fase fisica: 0% SERBIA DN 56, Craiova – Galicia Mare Km 0+000 – 47+000 Lunghezza: 47 km Valore: 187,79 mil. lei Costruttore: DELTA ACM 93 Fase fisica: 7,13% Lunghezza: 231 km – fase V di riabilitazione DN Lunghezza – 770 km - fase VI di riabilitazione DN DN 56, Galicia Mare - Calafat Km 47+000 – 84+020 Lunghezza: 37,02 km Valore: 101,62 mil. lei Costruttore: Mochlos SA Fase fisica: 0% 24

  24. RIABILITAZIONE STRADE NAZIONALI FASE VCON FINANZIAMENTO BEI– PROGETTI IN PREPARAZIONE, FASE DI GARA DN 76, Brad - Ionesti Km 30+436 – km 55+425 Lunghezza: 19,99 km DN 76, Ionesti - Varfurile Km 55+425 – 69+350 Lunghezza: 13,93 km DN 76, Soimus – Brad Km 0+000 – 30+436 Lunghezza: 30,44 km DN 66, Rovinari – Bumbesti Jiu Km 48+900 – 93+500 Lunghezza: 44,60 km Valore: 196,41 mil. Lei Costruttore: Vegyepszer ZRT Fase: contratto esecuzione lavori in fase di firma TOTALE GENERALE Obiettivi in preparazione (finanziamento rimborsabile) 109 KM SERBIA 22

  25. RIABILITAZIONE STRADE NAZIONALI – CON FINAZIAMENTO BUDGET DI STATO – PROGETTI IN FASE DI ESECUZIONE Deviazione DN 29D, km 18+500 - km 20+816 Consolidamento SR DN 18 km 3+522 – km 15+000 Rinforzo SR DN 28 km 69+657 – km 79+927 DN 29, Suceava – Botosani Lunghezza: 39,07 km Valore: 84,78 mil. Lei Costruttore: Spedition UMB / Tehnostrade / Arcada Comp. / Consitrans Fase: 0% Rinforzo SR DN 24 km 191+035 – km 197+040 Riabilitazione primaria DN 15E km 6+275 – km 45+280 DN 2D, Focsani – Ojdula Lunghezza: 118,873 km Valore: 737,19 mil. Lei Costruttore: Spedition UMB Fase: km 0+00 – 95+000: Settore 1: 100% Settore 2: 80% km 95+000 – 118+873: 33% Rinforzo DN 73A km 0+000 – km 19+910 km 20+975 – km 69+340 Consolidamento DN 74 km 56+895 – km 57+577 DN 73, Pitesti – Campulung – Brasov Lunghezza: 103,25 km Valore: 342,07 mil. Lei Costruttore: AZVI SA / Straco Group / Piomar Development / Tractebel Fase:0% DN 67C, Bengesti – Sebes Lunghezza: 142,62 km Valore: 1103,31 mil. Lei Costruttore: Romstrade Fase: 87% 2D DN 71, Baldana – Targoviste – Sinaia Lunghezza: 102,99 km Valore: 171,89 mil. Lei Costruttore: Spedition UMB/ Consitrans / Iptana Fase: 0% 67C DN 72, Gaesti – Ploiesti Lunghezza: 67,197 km Valore: 245.06 mil. Lei Costruttore: Spedition UMB Fase: 59% TOTALE GENERALE 984 KM 71 72 Lunghezza: 768 km Programma Riabilitazione DN DN 67B, Scoarta - Pitesti Lunghezza: 183,6 km Valore: 442,26 mil. Lei Costruttore: JV Strabag AG & Strabag Buc. & Delta ACM Fase: 0% DN 73, Largire la 4 benzi intre km 7+000 si km 11+100 si Strada di collegamento cu DN 73D Lunghezza: 7,28 km Valore: 138,71 mil. Lei Costruttore: Genesis & Straco Fase:64% Refacere sistem rutier DN 21 Lunghezza: 216 km Programma Riparazione Capitale DN Refacere sistem rutier DN 22 Tulcea – Ovidiu km 227+000 – km 287+400 30

  26. RIABILITAZIONE STRADE NAZIONALI CON FINAZIAMENTO NON-RIMBORSABILE DN 24 / DN 24B, Limita jud. Galati/Vaslui - Crasna – Albita Valore: 279,01 mil. Lei Lunghezza: 101,8 km Fase fisica: Lotto 1: 51,0%; Lotto 2: 59,0%; Lotto 3: 61,0% DN 1H, Zalau – Alesd, Valore: 244,10 mil. Lei Lunghezza: 69,334 km Fase fisica: Lotto 1 : 14,21% Lotto 2: 42,43% DN6, Filiasi – Ciochiuta Lunghezza: 28,52 km Valore: 82,67 mil. Lei Costruttore: Associazione Puentas Y Calzadas & Contrat Inginieria Y Orbas Fase fisica:44,46% • DN 6, Alexandria– Craiova • Valore: 491,76 mil. Lei • Lunghezza: 131,99 km • Fase fisica: • - lot1: 26,85%; • lot 2: 20,41%; • lot 3: 62,43% TOTALE GENERALE 344 KM DN 5, Bucuresti– Adunatii Copaceni Valore: 80,26 mil. Lei Lunghezza: 11,647 km Fase fisica: 23,44% SERBIA Lunghezza: 315 km (FINANZ. FEDR) Lunghezza: 29 km (FINANZIAMENTO ISPA) 34

  27. TANGENZIALI A PROFILO DI STRADA NAZIONALE

  28. TOTALE GENERALE 270,5 KM TANGENZIALI FINALIZZATE JBIC Lunghezza: 26,67 km Valore:53,39 MEUR V.O. Iasi Sud Lunghezza:5,84 km Valore:20 MEUR ISPA/PHARE Lunghezza: 49,66 km Valore: 102,65 MEUR V.O. Oradea Lunghezza:8,62 km Valore:29,10 MEUR BUGET Lunghezza: 69,87 km Valore: 276,19 MEUR V.O. Cluj Nord Est Lunghezza: 2,92 km Valore: 6 MEUR TOTALE: 124,325 km Valore: 366,29 MEUR Tangenziale Cluj Est Lunghezza: 19,045 km Valore: 98 MEUR V.O. Timișoara Sud Lunghezza: 12,08 km Valore: 30 MEUR Tangenziale Tecuci Lunghezza: 5,47 km Valore: 3,2 MEUR V.O. Lugoj Lunghezza: 9,5 km Valore: 29,2 MEUR Centura Ploiești Vest Lunghezza: 12,8 km Valore: 30 MEUR V.O. Domasnea Lunghezza: 3,523 km Valore: MEUR DN1, km 8+100 – 17+100 e tangenziale zona nord del mun. Bucuresti Lunghezza: 20,43 km Valore: 104 MEUR V.O. Caransebes Lunghezza:12,082 km Valore:35,97 MEUR V.O. Mehadia Lunghezza:2,275 km Valore:7 MEUR V.O. Dr. Turnu Severin Lunghezza:12,6 km Valore:20MEUR V.O. Adunații Copaceni Lunghezza: 4,2 km Valore: 4,5 MEUR SERBIA V.O. Craiova Lunghezza:14,10 km Valore:23,39 MEUR

  29. TOTALE GENERALE 223 KM TANGENZIALI IN ESECUZIONE Tangenziali in esecuzione - Bugetul de Stat Lunghezza: 135 km Costruzione tangenziali con finaziamento ISPA Lunghezza: 16km Costruzione tangenziali Con fondi FEDR Lunghezza: 72 km 47

  30. VARIANTI DI DEVIAZIONE – BUDGET DI STATO Strada tangenziale in mun. Oradea, etapa a II-a: - Settore 8,62 km, benzile 1+2: Lunghezza: 8,62 km Valore: 40,02 mil lei Costruttore: Selenia Oradea & Drumuri Bihor Fase: 93,76% - Settore 8,62 km, benzile 3+4: Lunghezza: 8,62 km Valore:75,86 mil. lei Costruttore: SC Selenia Oradea Fase: 92,25% - Settore 5,2 km: Lunghezza: 5,2 km Valore: 33,39 mil. lei Costruttore: SC Selenia Oradea Fase: 53% -Settore 1,78 km: Lunghezza: 1,78 km Valore: 0,21 mil. lei Costruttore: UMB Spedition Fase: 0% Variante di deviazione Suceava Lunghezza: 14,43 km Valore:240,45 Mil. Lei Costruttore: SC CCF Iasi / Grup COLAS Fase:76% Variante di deviazione Radauti Lunghezza: 16,58 km Valore:101,94 Mil. Lei Costruttore: Spedition UMB Fase: 0% Variante di deviazionea mun. Iasi - Variante Sud Lunghezza: 13,90 km Valore:264,24 Mil. Lei Costruttore: SC Vega 93 Fase: - Sezione I: 100% • Miglioramento traffico DN1, km 8+100 – 17+100 e cintura stradale zona nord mun. Bucuresti • Oggetto 5A: • Lunghezza: 4,65 km • Valore: 61,16 mil. Lei • Costruttore: FCC Construction +Alpine Mayreder Bau GMBH • Fase:95% • Oggetto 6: • Lunghezza: 2,6 km • Valore: 85,62 mil. Lei • Costruttore: FCC Construction +Alpine Mayreder Bau GMBH • Fase: 90% • - Oggetto 7: • Lunghezza: 3,10 km • Valore: 112,48 mil. Lei • Costruttore: Viacons / Aktor • Fase: 91,3% Variante di deviazione Cluj Est - Sezione I - km 4+575 - 6+900 Lunghezza: 2,325 km Valore: - contratto 3001: 38,17 Mil Lei - contratto 3005: 64,04 Mil. Lei Fase: contratto 3001 -70% contratto 3005 – 21% Strada di collegamento DN 1A, Sacele - Electroprecizie Lunghezza: 4,22 km Valore:12,79 Mil. Lei Costruttore: Asoc. Vectra Service SRL & Multimal Serv SRL Fase: 0% Allargamento a 4 corsie cintura stradale Bucuresti Sud intre A1 si A2 Settore 1: Lunghezza: Settore 1: 9,4 km Valore Settore 1: 139,39 Mil. Lei Costruttore Settore 1: Delta ACM + Tehnologica Radion + SC SIRD Fase: 30% Settore 2: Lunghezza: Settore 2: 10 km Valore Settore 2: 143,47 Mil. Lei Costruttore Settore 2: Euroconstruct trading 98 +Romstrade Fase: 5% Settore 3: Lunghezza: Settore 3: 12,52 km Valore Settore 3: 135,03 Mil. Lei Costruttore Settore 3: SC Straco Grup + Genesis + Mostobud Fase: 35% CRAIOVA Sud -Vest, DN 56 – DN 55 – DN 6 Lunghezza: 9,875 km Valore:90 Mil. Lei Costruttore: Asoc. SCT Buc. SA – Doprastav Fase: 0% Ammodernamento della cintura stradale del municipio Bucuresti tra A1 - DN 7 si DN 2-A2: Sezione A1- DN 7 Lunghezza: 8,695 km Valore:132,2 Mil. Lei Costruttore: Asoc. SC DELTA ACM 93 & AZVIRT LLC & MAXIDESIGN Fase: 0% SERBIA Lunghezza: 135 km 47

  31. COSTRUZIONE VARIANTI DI DEVIZIONE CON FINANZIAMENTO ISPA - LAVORI FINALIZZATI Variante di deviazione Caransebes Valore: 35,97 mil. Euro Lunghezza: 12,08 km Costruttore: Copisa Costruttorea Piranencia SA Fase:98% - deschis traficului Variante di deviazione Plugova Valore: 57,66 mil. Euro Lunghezza: 3,5 km Fase: fara finantare SERBIA Lunghezza: 16km 51

  32. COSTRUZIONE VARIANTI DI DEVIAZIONE CON FONDI FEDRPROGETTI IN ESECUZIONE Carei Lunghezza: 10,45 km Valore: 47,72 mil. lei Costruttore: Grupo Empresarial Magenta – Assignia Infrastructuras SA – Transmir SRL Fase: 0% Brasov, Lot I: Sezione 1, DN1-DN11 Lunghezza: 7,292 km Valore: 160,81 mil. lei Costruttore: ALPINE Bau GmbH Fase: 13,7% Lot II, Sezione 3, DN11-DN13 Lunghezza: 6,34 km Valore: 121,01 mil. lei Costruttore: Vectra Service Fase: 37% Sacuieni Lunghezza: 7,62 km Valore: 39,72 mil. lei Costruttore: IDECON S.A.U Fase: 0% Tecuci Lunghezza: 6,945 km Valore: 60,78 mil. lei Costruttore: Sociedade de Construcoes Soares Da Costa S.A. Fase: 0% Craiova Sud-Est Lunghezza: 6,285 km Valore: 44,53 mil. lei Costruttore: SECOL SpA / SECOL Romania Fase: 2,4% Caracal Lunghezza: 10,35 km Valore: 55,15 mil. lei Costruttore: Romstrade Fase: 9,21% Alexandria Lunghezza: 13,27 km Valore: 65,52 mil. lei Costruttore: Shapir Structures 1991 Fase: 40,2% Mihailesti Lunghezza: 3,18 km Valore: 33,39 mil. lei Costruttore: CONTRAT INGENIERIA Y OBRAS Fase: 0 SERBIA Lunghezza: 72 km 53

  33. COSTRUZIONE VARIANTI DI DEVIAZIONE CON FONDI FEDR –CON STUDI DI FATTIBILITA’ E DECISIONI DEL GOVERNO Campulung Moldovenesc Falticeni Bistrita Pascani Targu Frumos Alesd Nord Vatra Dornei Toplita Husi Dej Roman Gheorghieni Alesd Sud Bacau Stei Huedin Miercurea Ciuc – Ciceu - Siculeni Sighisoara Adjud Targu Mures Barlad Fagaras Tusnad Timisoara Sud Galati Pucioasa Titu Targoviste Buftea Targu Jiu SERBIA Budesti Rosiorii de Vede Filiasi Mangalia Lunghezza: 406 km 55

  34. PONTI E PASSAGGI 59

  35. Ponti e passaggi Leggenda: - Progetti in esecuzione Lunghezza: 10 km - Progetti in preparazione Lunghezza: 3 km PONTI E PASSAGGI CON FINANZIAMENTO DEL BUDGET DI STATO Passaggio dislivello su DN 19 km 108+746 la Moftin Consolidamento ponte su DN24 km 219+527 sul fiume Prut Sculeni - Sculeni Riabilitazione ponte su km 287+062 la Bicaz Passaggio dislivello su VO Arad, peste CF Brad – CF Curtici – DJ 709B Consolidamento ponte su DN24B km 49+092 sul fiume Prut , Albita - Leuseni Passaggio dislivello su VO Arad, (DN 7) peste CF Arad - Bucuresti Ponte su DN 13C sul fiume Salon a Mihaileni Consolidamento e riparazioni ponte su DN11 km 115+406 a Oituz Consolidamento ponte sue DN26A km 0+500 sul fiume Prut Oancea - Cahul Consolidamento ponte su DN2B km 149+841 sul fiume Prut Galati - Giurgiulesti Passaggio stradale Lunca Barzavei a Resita • Pasaggi sulla cintura stradale • Ploiesti Vest (DN1): • km 9+004 la Ploiesti • km 10+305 peste DN 72 • km 2+003 la Brazi • km 2+402 la Brazi • km 10+604 la Ploiesti Passaggio DN1A, km 18+230 su CF la Buftea SERBIA Ponte su DN 61 sul fiume Arges a Ionesti Ponte su DN 54 sul fiume Sai e variante nuova del DN 54 a Turnu Magurele 60