1 / 10

Regional Planning Meetings 2005

Regional Planning Meetings 2005. Planning and Engineering Overview Presented by Vivek Khanna , Airport Engineer. Airport Information Management System. Online at http://www.aeronautics.ok.gov. Features Airport Guide Capital Improvement Program Administrative Codes

jalena
Télécharger la présentation

Regional Planning Meetings 2005

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Regional Planning Meetings 2005 Planning and Engineering Overview Presented by Vivek Khanna, Airport Engineer

  2. Airport Information Management System Online at http://www.aeronautics.ok.gov Features • Airport Guide • Capital Improvement Program • Administrative Codes • Airport Development Worksheets • Pavement Management • System Plan • Consultants contact list

  3. Airport Guide PageOnline at : http://www.aeronautics.ok.gov

  4. Pavement Management Program • 33% of pavement requiring only routine maintenance • 67% of pavement requiring more significant rehabilitation • As time passes more pavement will require significant rehabilitation 2005 2010 Inventory Data for 81 Oklahoma Airports

  5. Airport Information • Construction history • Pavement type • Pavement thickness • General geotechnical information • Pavement Condition

  6. $1.00 Rehab here 40% Drop In Quality 75 % of Pavement Life $4.00 to $5.00 here 40% Drop In Quality 12 % of Pavement Life Cost-Effective Pavement Maintenance Pavement Condition Pavement Age

  7. Airport Development WorksheetsOn-line at: http://www.aeronautics.ok.gov • Goal: Present a Long-range development plan • Include allUNCONSTRAINED AIP ELIGIBLEneeds • Planning-Level Estimates • Compatible with FAA • Framework: • Airport Deficiencies • Short term – 0 to 5 yr • NPE • CIPs – Airport, OAC • 6-10 and 11 -20 year needs • The first step in a disciplined Capital Plan!

  8. ADWS Updates • Two-year cycle • 75 sponsors responded • Cover letter of Interest • Signed by Sponsor‘s authorized representative • Project Data-sheet • Identify the ODO and project scope • Justify project • Project sketch • Planning cost-estimate

  9. FAA’s NPIAS Needs Update 2005 • FAA will use Commission’s 0-5yr ADWS database • Update the NPIAS needs • Electronically upload the 0-5yr ADWS into FAA’s database • Reported to Congress • 20% of total 0-5yr ADWS - annual NPE • Important not to under identify airport’s needs!

  10. Typical Projects • Pavement Maintenance • Navigational aids • AWOS • Land acquisition • Pavement rehabilitation, widening or extension • Efficient Drainage • Action Plans and ALPs

More Related