Environmental Management System Implementation The Draft Navy EMS Implementation Guide

Environmental Management System Implementation The Draft Navy EMS Implementation Guide. 25 July 2002 Workshop. Mission. Activities/ Operations. Practices. Aspect. Aspect. Aspect. Impact. Impact. Impact. Resource. Resource. Resource. Practices, Aspects, Impacts-Concepts.

jariah
Télécharger la présentation

Environmental Management System Implementation The Draft Navy EMS Implementation Guide

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Environmental Management System ImplementationThe Draft Navy EMS Implementation Guide 25 July 2002 Workshop

  2. Mission Activities/ Operations Practices Aspect Aspect Aspect Impact Impact Impact Resource Resource Resource Practices, Aspects, Impacts-Concepts

  3. Practices, Aspects, Impacts-Inventory • Installations have an EQA inventory in place: • Practices • Practice Owners and Locations • Compliance Inspection and Oversight Evaluation Frequencies and Responsibilities • Need to make comprehensive and add: • Aspects • Impacts

  4. Practices, Aspects, Impacts-Relationships Monitoring and Measurement Inventory Risk-Based Priorities Objectives and Targets Actions, Projects Plan Check • Inventory is basis for risk evaluation and objectives and targets • Inventory is basis for EQA Internal Assessment

  5. Practices, Aspects, Impacts-First Steps • Update existing EQA inventory with aspects and impacts information • Initially may not be comprehensive • Goal to get EMS implementation underway • Follow implementation strategy established in Pre-Planning phase

  6. Mission Activities/ Operations Practices Aspect Aspect Aspect Impact Impact Impact Resource Resource Resource Risk to Mission

  7. Impacts and Risk

  8. Practices, Aspects, Impacts - Risk Ranking • Evaluate relative risk to mission to prioritize practices/aspects • Process should be: repeatable, documented, defensible, and periodic • May apply qualitative approach initially and apply quantitative method later

  9. Pollution Prevention Opportunities • Navy installations have mature P2 Programs in place • The practice inventory may suggest P2 opportunities not considered within the traditional HW/industrial process focus of P2

  10. Pollution Prevention Opportunities- First Steps • Review practice inventory for P2 opportunities • Apply P2 approach to identify and develop solutions for: • Industrial practices not previously identified • Non-industrial practices • Environmental aspects

  11. Objectives and Targets • Objectives define an end-state supportive of the installation’s environmental policy goals • Targets are detailed performance standards that quantify each objective • Should be achievable and measurable • Periodically review and revise

  12. Objectives and Targets-Types

  13. Objectives and Targets-Relationships Environmental Policy Goals Requirements Media Programs Objectives and Targets Risk-Based Priorities Actions, Projects Mission, Local Conditions Plan Do

  14. Actions and Projects • Actions - behavioral/administrative initiatives or outside support within the CO’s means • Realign existing R/R • Develop and provide training or procedures • Secure NAVFAC support • Projects - initiatives requiring external funding, requested and justified through PPBS • P2 investments • Studies • Plan development

  15. Actions and Projects-Relationships Risk-Based Priorities Actions Monitoring and Measurement Objectives and Targets POM Projects Programs Plan Do Check

  16. PolicyPlanningImplementationChecking/Corrective ActionManagement Review

  17. Structure: The EMS Team • Designated by Installation/Regional Commander • Includes Senior Management (EQB) • CO/XO’s of installation and tenants • Department/Division managers • Environmental office manager • Includes Technical Support and EMS Implementation • Media managers and other environmental office staff • Environmental POCs

  18. Tenants Production Maintenance ROICC Supply Quality Human Resources Environmental Safety and Health Public Affairs Comptroller BOS Contractors EMS Team may include personnel from

  19. Structure: Environmental Office • Media programs • Mature • Already in place • EMS elements in place • P2 • Legal requirements • Emergency response • PPBS • Training Cultural Resources Solid Waste Noise NEPA UST IPR Drinking Water Pesticides Radon Asbestos P2 Air Natural Resources Infectious Wastes HM/HW

  20. Structure: Practice Owners • “Command, unit, or office that uses a practice to accomplish its mission” • Authority to accomplish their mission using a practice responsibility to control its aspects • Accountability = Responsibilities +Authority 4

  21. Accountability = Responsibilities +Authority Environmental Office EMS Team Practice Owners EMS Elements 4 Media Programs 4 Practices

  22. Training -Current • Required by Regulation • Media related: HW worker, WWTP operation, asbestos worker, emergency response • Job Related • Generally for environmental staff: NEPA, ERMS, computer skills

  23. Training for EMS Implementation • Initial EMS Team Training • Senior Management • Environmental Support Staff • Practice Owners Training • Environmental SOPs • Video • Interactive • Web

  24. EMS Description Document • Include installation EMS Policy • Demonstrates & communicates implementation • Objectives and targets • Organizational structure and key responsibilities • EMS elements • Incorporate or provide a roadmap to information supporting each EMS element

  25. Communication • Internal • Senior management’s role • Environmental staff translate requirements into procedures and distribute to practice owners • Mechanism for practice owners to communicate with Environmental Office • External • Public Affairs Office

  26. Environmental SOPs • Document for each practice • Location, owner, POC • Aspects and potential impacts

  27. Environmental SOPs • Document for each practice • Location, owner, POC • Aspects and potential impacts • Requirements, Procedures, Responsibilities for • Operational control • Communications • Emergency preparedness and response • Inspection • Training

  28. Environmental SOPs • Document for each practice • Location, owner, POC • Aspects and potential impacts • Requirements, Procedures, Responsibilities for • Operational control • Communications • Emergency preparedness and response • Inspection • Training • Design, capacity, inputs • Physical controls, P2 options, and BMPs in place

  29. Tailored Environmental SOPs • Practice owners need to know or provide • Location, owner, POC • Procedures, Responsibilitiesfor • Operational control • Communications • Emergency preparedness and response • Inspection • Training

  30. Emergency Preparedness & Response • Plans prepared, not distributed • Training up to date ?? • Distribute procedures in Environmental SOPs

  31. PolicyPlanningImplementationChecking/Corrective ActionManagement Review

  32. Monitoring and Measurement • Sampling and analysis • Internal assessment efforts • Tracking progress in meeting objectives and targets

  33. Problem/Cause Identification Corrective/Preventive Action • Review results of internal assessment efforts • Conduct “problem solving”

  34. Problem/Cause Identification Corrective/Preventive Action • Suggested “problem solving” approach • Define problem • Analyze root causes • Develop alternatives • Select corrective action • Develop corrective action • Implement corrective action • Follow-up

  35. EMS Review • Answer two questions • Does the EMS, as described in the EMS Description Document, meet current Navy criteria? • Does the EMS, as implemented, effectively do what the EMS Description Document says it will do?

  36. PolicyPlanningImplementationChecking/Corrective ActionManagement Review

  37. Management Review • Analyze results of following • EMS review • Internal assessments • Status of corrective/preventive actions • Progress in meeting objectives and targets • Implement improvements to EMS • Revise policy • Revise objectives and targets • Revise EMS procedures • Document results

  38. Conclusions • You already have a lot elements in place • Requirements • P2 • Programs • PPBS • Emergency Response • Checking and Corrective Action (EQA Program)

  39. Conclusions • Initial EMS improvements you can do • Designate EMS Team • Obtain/provide initial EMS training • Develop/distribute Policy • Add aspects and impacts to practice inventory • Conduct risk evaluation • Develop objective and targets • Complete EQA implementation