Geant-4 simulation: draft schedule. 15 Oct 22 Oct 28 Oct. BCG B BCG. 7 Oct 20 Oct 31 Oct. G GB GCB. 25 Oct 10 Nov 20 Nov. CGB CGB GCB. (target date). who. Subproject. Setup of Geant-4 geometry: insert simplified beam-line elements

jean
Télécharger la présentation

Geant-4 simulation: draft schedule

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Geant-4 simulation: draft schedule 15 Oct 22 Oct 28 Oct BCG B BCG 7 Oct 20 Oct 31 Oct G GB GCB 25 Oct 10 Nov 20 Nov CGB CGB GCB (target date) who Subproject • Setup of Geant-4 geometry: • insert simplified beam-line elements • complete setup of new sensitive sensors (CsI, Diamonds…) • check internalgeometry consistency (overlaps, positions…) • Setup of Geant-4 magnetic fields: • define translation of magnetic fields from G3/Turtle to G4 • implement magnetic fields on HER and LER • check consistency with Turtle (HER rays) • Setup of Analysis code: • define variables to be dumped • build/debug framework module to dump root-tuples • merge geometry, magnetic fields and analysis • Initial simulation validation: • check consistency between Geant-4 and Turtle (Both rings) • compare with Geant-3 simulations • start evaluating source distributions for various sensors • … Legend: B = Bond C = Calde G = Gary

More Related