jeff
Uploaded by
30 SLIDES
403 VUES
300LIKES

High performance bioinformatics

DESCRIPTION

Group May 09-06 Bryan McCoy Kinit Patel Tyson Williams Advisor/Client: Zhao Zhang. High performance bioinformatics. What is Bioinformatics?. Genetic sequencing Massive amounts of data Many simple operations Perfect for distributed computing. Problem.

1 / 30

Télécharger la présentation

High performance bioinformatics

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Group May 09-06 Bryan McCoy Kinit Patel Tyson Williams Advisor/Client: Zhao Zhang High performance bioinformatics

  2. What is Bioinformatics? • Genetic sequencing • Massive amounts of data • Many simple operations • Perfect for distributed computing

  3. Problem • Current solutions are not realistically feasible • Too expensive • Super computers • High powered servers • Too slow • Some inputs can takes several days • Need for high speed, low cost solutions

  4. Our Solution • Cell Processor • Based on Phase 1 • Cluster of PlayStation 3s • MPI • Message Passing Interface

  5. IBM Cell Broadband Engine • 1 Power Processing Element (PPE) • 8 Synergistic Processing Elements (SPEs) • Only 6 SPEs are accessible on a PlayStation 3 • 4 high speed rings for processor communication

  6. DNAPenny • Compares DNA strands from different species • Score indicates evolution similarities between two species • Branch and bound search algorithm

  7. Functional requirements • FR1. Ported applications shall run on the Cell B.E. • FR2. The results returned shall be the same as the original program. • FR3. The applications shall return their runtime. • FR4. The applications shall execute in parallel on multiple Cell B.E.s.

  8. Non-Functional Requirements • NF1. The Cells shall all run on the Linux OS. • NF2. The resulting runtimes of the ported applications shall be faster than on the original applications. • NF3. The ported application shall be coded in the C language.

  9. Market Survey • Results of the survey point to a huge speed up of computationally intensive programs. • Dr. GauravKhanna at the University of Massachusetts Dartmouth used cluster of 8 PS3s to replace a supercomputer. • Universitat Pompeu Fabra, in Barcelona, deployed in 2007 a BOINC system called PS3GRID for collaborative biological computing.

  10. Risk Assessment • Slow network speed • Software support • Limited RAM • Hardware Failure • Lower quality entertainment hardware • Limited prior experience • Software development schedule

  11. Resource Requirements • 3 PlayStation 3s • High performance network switch • Cell programming books • Front node (desktop computer) • Time

  12. Software Environment • Use Fedora 9 OS as it is currently supported by the Cell SDK 3.1. • Uses the command line for user interface. • Use the IBM XLC compiler and/or the current GCC compiler.

  13. Hardware Environment • 3 PlayStation 3s • High speed Crossbar switch • Private network • Front Node (desktop computer) • Proxy server • Network File Store (NFS)

  14. I/O • Input • Inputs are DNA sequences stored in a text file. • Text is a CustalW alignment organized in Phylip format, a standard format for biological applications. • Output • Outputs are • The parsimony score • The best trees • The execution time • The score and best trees are output to the screen and to text files. • The execution time is output to a CSV (Comma Separated Value) file.

  15. Work Breakdown Structure

  16. Work Schedule • Gant chart

  17. Deliverables • Source Code • Compiled Executable • Runtime Comparisons • Final Report • Poster • Final Presentation

  18. Costs • Time • Approximately 555 man hours total. • Freely donated. Total cost $0. • Equipment • 3 PlayStation 3s • Provided by client • Crossbar router • Provided by client • Standard desktop computer • Provided by department Total cost $0.

  19. Development: Initial Overview • Use MPI to distribute the program to the multiple PlayStations. • Each PlayStation would search one branch of the tree. • 1 function (supplement) took 90% of the runtime • Phase 1 ported this function to the SPEs

  20. Development: Difficulties • Found a bug in supplement. • The bug did not affect results but did affect runtime. • We contacted the original developer, Dr. Felsenstein at the University of Washington, who fixed the bug. • The fix significantly improved runtime. • However, the fix negated all work done by Phase 1 as supplement no longer took a significant amount of runtime.

  21. Development: Reworking • After the bug fix, no single function took a significant amount of runtime. • We decided to distribute branches of the tree search to different processors.

  22. Development: Results • Completed our goals • Divided work among 3 PlayStation 3s. • Produced faster code that comparable sequential environment. • Due to time constraints, we were not able to port the code to the SPEs.

  23. Testing • Used script to test multiple inputs. • Averaged the runtimes. • Used several different code revisions and machines to provide comparisons. • Projected the speedup that could be attained if code was ported to SPEs.

  24. Results: Actual • Our current code is 20.76 times faster than the it was at the beginning of the semester. • Surpassed our original projections, which assumed the use of the SPEs.

  25. Results: MPI • The speedup for MPI was 2.78. • Excellent speedup for 3 nodes.

  26. Results: Comparison • Our final code came close to a high powered desktop. • Core 2 Quad at 2.66 GHz • Our projected results indicate a speedup of 6.4.

  27. Results: Projected • Using all SPEs, the speedup should be 145.35 • Assuming SPEs run as fast as the PPEs • Before SPE vectorization

  28. Conclusions • Achieved our goal of using MPI to get runtime improvement. • Contributed a major fix to a widely used application. • Surpassed our initial runtime goal. • Projected results show an even larger runtime improvement still possible.

  29. Acknowledgements • May08-24 group (phase I) • Kyle Byerly • Shannon McCormick • Matt Rohlf • Bryan Venteicher • DNAPenny Author • Dr. Felsenstein • Advisor • Zhao Zhang • Environment Help • Steve Nystrom