1 / 4

FLASH DAQ

Johnny Ng FLASH Coll. Mtg. 7/25/03. FLASH DAQ. Status Task list Summary. Status. New PC (Windows XP) installed Stable and faster operations Could run while network is connected Readout of new FLASH toroid working Digital scope readout ~ 2 Hz (vs. <1 Hz in T-461)

jhaber
Télécharger la présentation

FLASH DAQ

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Johnny Ng FLASH Coll. Mtg. 7/25/03 FLASH DAQ • Status • Task list • Summary

  2. Status • New PC (Windows XP) installed • Stable and faster operations • Could run while network is connected • Readout of new FLASH toroid working • Digital scope readout ~ 2 Hz (vs. <1 Hz in T-461) • Online/real-time analysis (See Kevin’s talk)

  3. Task List • User-friendly online/real-time analysis (Kevin) • Electronic log-book • Need volunteer • Integrate Beam Profile Monitor (C.W.Chen et al.) • Integrate Filter-wheel control and monitor (Kevin & Stan)

  4. Summary • Existing (T-461) system improved • New features (to be) added (unless we’re happy with “pen & paper” technology) • New systems to be integrated (Gas system will probably be the same as before.)

More Related