1 / 109

PRESENTATION TITLE Presented by: Name Surname Directorate Date

Annual report for the 2014/15 financial year Presented by: Margaret-Ann Diedricks Director-General 14 October 2015. PRESENTATION TITLE Presented by: Name Surname Directorate Date. Annual report for the 2014/15 financial year. CONTENTS. Introduction

jihan
Télécharger la présentation

PRESENTATION TITLE Presented by: Name Surname Directorate Date

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Annual report for the 2014/15 financial year Presented by: Margaret-Ann Diedricks Director-General 14 October 2015 PRESENTATION TITLE Presented by: Name Surname Directorate Date

  2. Annual report for the 2014/15 financial year CONTENTS • Introduction • Part 1: Overview of non-financial performance • Part 2: Overview of financial performance • Part 3: Progress report on financial misconduct cases • Abbreviations / acronyms • Annexure: Detailed expenditure trends per programme (Main Account)

  3. Introduction • Creation of a new Water and Sanitation department resulted in the transfer of sanitation function from the Department of Human Settlements. • Main focus areas during 2014/15 financial year: • Clarify the mandate of the new Department to distinguish it from that of the previous Department of Water Affairs, particularly in relation to the function of sanitation. • Ensuring that the function of sanitation which has been largely captured and centred on the issues of bucket eradication is widely understood • water governance: alignment of the role and responsibilities of our entities to the department’s mandate • Strengthening risk and internal audit in order to deal with any lapses around decision making to give effect to the turnouts of the PFMA. • Achievement of an unqualified audit opinion for the Water Trading and improvement of the Main Account qualified opinion • Gone beyond to assisting the 139 municipalities (e.g. Makana and Madibeng interventions)

  4. Part 1: overview of non-financial performance

  5. Analysis: achievement of the strategic oriented goals Achieved (100%) Partially achieved (50 – 99%) Not achieved (<50%)

  6. Analysis of annual performance Main Account Water Trading Achieved (100%) Partially achieved (50 – 99%) Not achieved (<50%)

  7. Analysis per budget programme Achieved (100%) Partially achieved (50 – 99%) Not achieved (<50%)

  8. Analysis per budget programme Achieved (100%) Partially achieved (50 – 99%) Not achieved (<50%)

  9. Detailed analysis of Main Account • Programme 1: administration • Programme 2: water sector management • Programme 4: regional implementation and support • Programme 5: water sector regulation • Programme 6: international water cooperation

  10. Administration Achieved (100%) Partially achieved (50 – 99%) Not achieved (<50%)

  11. Administration explanatory notes

  12. Water Sector Management Achieved (100%) Partially achieved (50 – 99%) Not achieved (<50%)

  13. Water Sector Management explanatory notes

  14. Water Sector Management explanatory notes

  15. Regional Implementation & Support Achieved (100%) Partially achieved (50 – 99%) Not achieved (<50%)

  16. Regional Implementation & Support explanatory notes

  17. Regional Implementation & Support explanatory notes

  18. Regional Implementation & Support explanatory notes

  19. Regional Implementation & Support explanatory notes

  20. Water Sector Regulation Achieved (100%) Partially achieved (50 – 99%) Not achieved (<50%)

  21. Water Sector Regulation explanatory notes

  22. Water Sector Regulation explanatory notes

  23. International Water Cooperation Achieved (100%) Partially achieved (50 – 99%) Not achieved (<50%)

  24. International Water Cooperation explanatory notes

  25. Detailed water trading performance • Programme 1: administration • Programme 3: water infrastructure management • Programme 4: regional implementation and support

  26. Water Trading Achieved (100%) Partially achieved (50 – 99%) Not achieved (<50%)

  27. Water Trading explanatory notes

  28. Water Trading explanatory notes

  29. Water Trading explanatory notes

  30. Water Trading explanatory notes

  31. OVERVIEW OF audit report

  32. Main Account analysis

  33. Water trading analysis

  34. Action plan

  35. Part 2: overview of financial performance

  36. Main Account • Programme expenditure trends • Notes to the financial statements • Overview of the audit report and action plan

  37. Expenditure outcome: 31 March 2015

  38. Consolidated expenditure per programme

  39. Expenditure per Infrastructure (Grants) Programme

  40. Reasons for Underspending • Administration: 7% (R68.093m) – delayed invoices for office accommodation and municipal services, and the imported equipment relating to Data Storage Infrastructure. • WS Management: 7% (R35.004m) - delayed purchasing of laboratory analyses instruments for national surface water quality programme and Inductively Coupled Plasma Optical Emissions Spectrometer Instrument. • Regional Implementation: 21% (R1.891bn) • prolonged signing of SLA and the delayed delivery of materials by suppliers (MWIG), • delays in the finalisation of the implementation plan by the newly appointed Implementing Agent and the delays in delivery of ordered material needed for implementation of various regional bulk infrastructure programme (RBIG), • insufficient infrastructure to support Bucket Eradication Programme, cash flow challenges experienced by the Implementing Agents (Sanitation) • Water Services Regulation: 21% (R33.525m) delayed implementation of a drinking water quality and wastewater management project, and the prolonged period it took for the draft pricing strategy due to consultations

  41. Expenditure per economic classification

  42. Notes to the financial statements The financial statements have been prepared in accordance with Modified Cash Standard and relevant guidelines specified / issued by the National Treasury.

  43. Unauthorised expenditure 85% not within purpose of vote 15% overspend 43

  44. Irregular expenditure Analysis: Under Investigation R77.65m : Contravention of SITA Act

  45. Irregular expenditure annual movement

  46. Fruitless and Wasteful Expenditure Interest _R1 million

  47. Fruitless expenditure annual movement

  48. Commitment analysis

  49. Accruals 49

  50. OVERVIEW OF audit report

More Related